Similar Projects
Historic Miramar Infrastructure Improvements, Phase IV
Infrastructure
Bidding
$8,000,000 est. value
Miramar, FL

Resurfacing/Lighting/Pavement Markings/Sidewalk - SR 7 (US 441)
Infrastructure
Bidding
$1,924,025 est. value
FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Undergrounding of Overhead Utilities and Streetscape
Results
Less than $10,000,000 est. value
Hollywood, FL 33022

Interchange Improvement
Results
Less than $358,465 est. value
FL

Resurfacing/Lighting/Drainage Improvements - SR 842 (Broward Blvd)
Infrastructure
Bidding
$3,734,606 est. value
FL

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Resurfacing
Results
Less than $1,074,084 est. value
Hollywood, FL

University Dr - Add Lanes and Reconstruct/Milling and Resurfacing/Drainage Improvements/Base Work
Infrastructure
Bidding
$12,184,823 est. value
FL

Accessways and Driveways Construction Services, Roadway Maintenance Services, and Drainage Services
Renovation
Post-Bid
Hollywood, FL

Construction Manager at Risk (CMAR) Sidewalks, Streetlights, Streetscape, Landscape, Trails and Other Public Projects
Results
Hallandale, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Construction of Speed Tables
Results
$266,100 est. value
Davie, FL

SW 25th Street Complete Street Improvements
Infrastructure
Post-Bid
$1,900,000 est. value
West Park, FL 33023

Reported 04/19/2022 12:00 AM
Project Title

Milling and Resurfacing Project

Physical Address View project details and contacts
City, State (County) Miramar, FL 33023   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Contractor (for roadway construction) to Furnish all labor, equipment, materials and supplies necessary for milling, resurfacing and pavement marking installation on Miramar Parkway, from Dykes Road to Flamingo Road, but not including the Florida Department of Transportation (“FDOT”) ROW over the I-75 in the City of Miramar. The scope of work includes milling 1” and resurfacing with 1” of asphaltic concrete. Contractor shall use an FDOT approved plans to provide the super pave asphaltic concrete course. Milling and resurfacing activities at intersecting roads shall extend to the front of the stop bar of the intersecting road. Refer to FDOT standard specification for road and bridge construction. All pavement marking including RPMs shall be installed per the Broward County Traffic Engineering Division approved plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents