Similar Projects
South - Regional Construction MATOC
Bidding
$500,000 to $1,000,000 est. value

Street Resurfacing/Upgrading FY2020
Bidding
Gulf Shores, AL

Southern Region Disaster Recovery Support BPA
Post-Bid

Future Foley City Road
Post-Bid
$400,000 to $425,000 est. value
Foley, AL

Resurfacing Projects 2019
Results
Bay Minette, AL

Constructing the Intersection Modifications to Include Turn Lane Improvements
Results
$159,588 to $195,052 est. value
AL

Daphne Innovations and Science Complex
Construction
Less than $3,000,000 est. value
Daphne, AL

Baldwin County Resurfacing Projects 2020: Group #4
Bidding
AL

Street Resurfacing
Post-Bid
Daphne, AL 36526

Magnolia Springs Pavement and Drainage Rehabilitation Project
Results
Magnolia Springs, AL

Gulf Shores School Zone Transportation Improvements
Post-Bid
Gulf Shores, AL 36547

9th Avenue Extension
Results
Foley, AL

Resurfacing Projects for FY19
Post-Bid
Foley, AL 36535

SR-161 Intersection Improvements at Terry Cove Drive
Results
Less than $101,098 est. value
Orange Beach, AL

Commerce Drive Phase V
Post-Bid
Gulf Shores, AL 36547

Last Updated 03/01/2019 12:59 PM
Project Title

Coastal Gateway Boulevard Widening and Signal Improvements (formerly County Road 8 East)

Physical Address View project details and contacts
City, State (County) Gulf Shores, AL   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work will include the relocation of utilities and the widening and reconstruction of County Road 8 and Signal Improvements from State Route 59 to the Foley Beach Express. The proposed work will also include temporary traffic control, erosion control, drainage improvements, and procurement of bonds. This contract is for the purpose of providing all materials and labor necessary to construct the widening of County Road 8.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents