Similar Projects
Kwik Trip - Dodd Avenue / Saint Peter
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Saint Peter, MN 56082

Kwik Trip - Dodd Avenue / Saint Peter
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Saint Peter, MN 56082

CSAH 13 Concrete Overlay
Infrastructure
Post-Bid
$4,447,345 CJ est. value
Saint Peter, MN 56082

CSAH 13 Concrete Overlay
Infrastructure
Post-Bid
$4,447,345 CJ est. value
Saint Peter, MN 56082

Grading and Riprap
Infrastructure
Results

Grading, Bituminous Surfacing
Infrastructure
Results
MN

North 3rd Street Sports and Recreation Field House
New Construction, Infrastructure - 4,800 SF
Pending Verification
$1,100,000 CJ est. value
Saint Peter, MN 56082

North 3rd Street Sports and Recreation Field House
New Construction, Infrastructure - 4,800 SF
Pending Verification
$1,100,000 CJ est. value
Saint Peter, MN 56082

Caswell Park Phase #2 Fieldhouse Construction - City of North Mankato
Infrastructure
Conception
$17,000,000 CJ est. value
North Mankato, MN 56003

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Street and Miscellaneous Paving Improvement
Infrastructure
Results
North Mankato, MN

Somerset Lane Improvements - City of North Mankato
Infrastructure
Conception
$4,316,000 CJ est. value
North Mankato, MN 56003

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Hoover Drive SRTS - City of North Mankato
Infrastructure
Conception
$520,000 CJ est. value
North Mankato, MN 56003

Last Updated 05/25/2023 09:03 AM
Project Title

Howard Drive/Lor Ray Drive Roundabout - City Of North Mankato

Physical Address View project details and contacts
City, State (County) North Mankato, MN 56003   (Nicollet County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. This project is in included in the City of North Mankato FY 2023-2027 Capital Improvement Plan (CIP). As of May 25, 2023, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents