Similar Projects
O'Reilly Auto Parts (NB2) / New Bern
New Construction, Infrastructure
Conception
$400,000 CJ est. value
New Bern, NC 28560

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Fairview Street Culvert Repair
Infrastructure
Bidding
$300,000 CJ est. value
Havelock, NC 28532

Roadway and Parking Lot Improvements
Infrastructure
Post-Bid
New Bern, NC 28562

P134, Construct Slocum Road Physical Security Compliance
New Construction, Infrastructure, Renovation
Post-Bid
$100,000,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

CP2001M Repair Airfield Pavement FY21
Term Contract
Results
$10,000,000 est. value
Cherry Point, NC 28533

2021 Paving Program
Infrastructure
Results
$150,000 est. value
River Bend, NC

Hatteras Yachts Expansion / New Bern
Addition, Demolition, Infrastructure, Renovation
Pending Verification
$34,000,000 CJ est. value
New Bern, NC 28560

Hatteras Yachts Expansion / New Bern
Addition, Demolition, Infrastructure, Renovation
Pending Verification
$34,000,000 CJ est. value
New Bern, NC 28560

Relocation Of Water And Sanitary Sewer Force Main For The Replacement Of Bridges 91 And 92 On Us 70 In Havelock, Carteret County
Infrastructure
Bidding
$9,000,000 CJ est. value
Havelock, NC 28532

Repair Airfield Burn Pit
Alteration
Post-Bid
$200,000 to $500,000 est. value
Cherry Point, NC 28533

Strengthening, Resurfacing, and Shoulder Reconsruction of NC101
Infrastructure
Results

Highway 70 Sewer Replacement
Infrastructure
Bidding
$736,000 CJ est. value
Havelock, NC 28532

2022 Paving Program
Infrastructure
Post-Bid
New Bern, NC

Milling, Resurfacing, And Shoulder Reconstruction
Infrastructure
Results
NC

Last Updated 02/16/2023 02:25 PM
Project Title

RFQ D/B - US 70 Improvements from the Havelock Bypass to east of SR 1116 (Thurman Road)

Physical Address View project details and contacts
City, State (County) New Bern, NC 28562   (Craven County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $242,350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 16, 2023, the award Construction Manager anticipates construction starting on this project fall 2024. A definite start month is not known at this time. Orig solicitation: The Design-Build Team herein acknowledges that it has carefully examined the location of the proposed work to be known as Contract No. C204695; has carefully examined the Final Request for Proposals (RFP) and all addendums thereto, specifications, special provisions, the form of contract, and the forms of contract payment bond and contract performance bonds, which are acknowledged to be part of the Contract; and thoroughly understands the stipulations, requirements and provisions. The undersigned Design-Build Team agrees to be bound upon their execution of the Contract and including any subsequent award to them by the Secretary of Transportation in accordance with this Contract to provide the necessary contract payment bond and contract performance bond within fourteen calendar days after the written notice of award is received by them. If the Design-Build Proposal is accepted and the award is made, the Technical Proposal submitted by the Design-Build Team is by reference, incorporated and made part of this contract. Wbs Element No. 44648.3.4 The contract is valid only when signed either by the Contract Officer or such other person as may be designated by the Secretary to sign for the Department of Transportation. The conditions and provisions herein cannot be changed except by written approval as allowed by the Request for Proposals. Miles: 6.4 Location: Us 70 From the Havelock Bypass to East of Sr 1116 (Thurman Road) Type of Work: Design-build as Specified in the Scope of Work Contained in the Request for Proposals The date of availability for this contract is February 27, 2023, except that the Design-Build Team shall only begin ground disturbing activities as allowed by this Request for Proposals (RFP). The Design-Build Team shall consider this factor in determining the proposed completion date for this project. The completion date for this contract is defined as the date proposed in the Technical Proposal by the proposer who is awarded the project. The completion date thus proposed shall not be later than October 1, 2028. NCDOT - U.S. 70 Improvements - Havelock Bypass to East of SR 1110 (Thurman Road)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents