Similar Projects
Property Clean-up - 5213 US 27 South
Term Contract
Design
Sebring, FL 33870

Grounds Maintenance at City Fire Stations and Other Fire Administration Locations Rebid
Term Contract
Sub-Bidding
Gainesville, FL 32601

Fuel Pump - Maintenance, Repair and Replacement
Term Contract
Sub-Bidding
Fort Myers, FL 33901

Vegetation Management Transmission Lines Deep Row
Post-Bid
New Smyrna Beach, FL

Pest Control Services
Post-Bid
FL

Annual Mosquito Mitigation Services
Results
FL

Mechanical/HVAC Trade Contract Services
Results
Ocala, FL

Term Contract for Historical Markers
Term Contract
Sub-Bidding
Sanford, FL 32771

Pesticides
Term Contract
Post-Bid
FL

2330--Supply: Eight Station Shower Trailer
Term Contract
Results
Tampa, FL 33612

Water Meter Vaults - Re-Bid
Term Contract
Sub-Bidding
Pensacola, FL 32514

Specifications For Port-A-Potty Services For Electric Utility In Post Disaster Environment
Term Contract
Post-Bid
Moore Haven, FL

Annual Clear Board and Seal
Term Contract
Results
Gainesville, FL

Mobile Hose and Hydraulic Repair Services
Term Contract
Sub-Bidding
$125,000 CJ est. value
Stuart, FL 34994

Downtown Exterior Maintenance Services
Term Contract
Post-Bid
Gainesville, FL

Last Updated 09/26/2022 08:04 AM
Project Title

Overhead Inspection and Treatment of SECO Energy's Distribution Poles

Physical Address View project details and contacts
City, State (County) Sumterville, FL 33585   (Sumter County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Owner To Subcontract, Bids by Invitation
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

This specification outlines all requirements for contractors hired by Sumter Electric Cooperative, Inc. (SECO) to perform system pole inspections and treatments. This activity will require the ground-line testing and pole treatments on the poles that are specifically noted to the vendor to be visited (average annual volume of 16,920 poles). Contractor will perform the Services as set forth in Exhibit G to this Statement of Work. SECO will furnish the Contractor with electronic data indicating the locations and relationships of these poles with geographic background information. The Contractor will return electronic data regarding the inspection results and determinations to SECO, using the form included with Exhibit D in this Statement of Work. Contractor will meet the following inspection and reporting schedule for each year that Contractor is engaged under the Service Agreement, time being of the essence: Per Statement of Work and Bid Specifications. Question End Date 10/24/2022 5:00 PM Bid Bond Required No Performance Bond Required Yes Performance Bond Amount $125,000.00

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents