Similar Projects
Primate Center Chilled Water Extension - GPC
Infrastructure
Bidding
$2,130,800 est. value
Madison, WI 53774

2021 Utility Improvements
Infrastructure
Bidding
$475,000 est. value
Fort Atkinson, WI 53538

Storm Main Repair
Post-Bid
Tomah, WI

42-Inch Transmission Water Main Phase 2
Post-Bid
Less than $6,300,000 est. value
Racine, WI 53400

2020 Utility Replacements
New Construction, Renovation
Results
Sturgeon Bay, WI 54235

Tanager Street Extension
Renovation
Results
Waupun, WI 53963

Getzen Street Watermain
Infrastructure
Bidding
Elkhorn, WI 53121

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

County Line Road Sanitary Sewer and Water Main Conversion
Results
$1,800,000 to $2,100,000 est. value
Menomonee Falls, WI 53051

Larch Court Construction
Infrastructure
Bidding
Lancaster, WI

Marathon Avenue Sewer, Water Main, and Street Construction
Post-Bid
Neenah, WI 54956

Division Street and Prospect Street Sanitary Sewer and Water Main Reconstruction
Results
Winneconne, WI 54986

2021 Sanitary Sewer and Water Main Improvements
Infrastructure
Bidding
Baraboo, WI

Bridge Deck Surface Rehabilitation, Cleaning and Epoxy Sealing
Post-Bid
Barron, WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Last Updated 08/10/2021 05:41 PM
Project Title

Green Stormwater Infrastructure Improvements Barkers Island Marina

Physical Address View project details and contacts
City, State (County) Superior, WI 54880   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Establishment of site sediment and erosion controls including perimeter sediment barriers, turbidity curtain, sediment trap, tracking pad, grading of gravel parking area to direct runoff to sediment trap during construction, removal and disposal of selected trees, installation of wetland outlet consisting of concrete weir wall anchored in place with helical piles, grading and construction of a stormwater treatment wetland with two wetland cells, forebay and maintenance access (9000 sf wetland, 0.5 acre total area disturbed), installation of two rock weirs separation wetland areas, removal and disposal of excess soil, removal of sediment trap and installation of riprap-lined forebay, removal of perimeter sediment controls once site is stabilized (site stabilization; seeding, mulching, erosion control blankets and establishment of wetland vegetation will be contracted separately from the wetland construction) .

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents