Similar Projects
Myint Lane Airport Apron Development - City of Concord
New Construction, Infrastructure
Conception
$1,350,000 est. value
Concord, NC 28027

General Aviation (GA) Complex - City of Concord
New Construction
Conception
$18,000,000 est. value
Concord, NC

Taxilane Widening
Infrastructure
Bidding
$700,000 CJ est. value
Beaufort, NC 28516

Johnson Regional Airport Hangar and Office Space
New Construction
Post-Bid
Smithfield, NC

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

P197 DB Aircraft Maintenance Hangar, MCAS Cherry Point, NC
New Construction
Results
$181,430,000 est. value
Cherry Point, NC

Shelby T-Hangar and Taxilane Phase 2
Renovation
Results
Shelby, NC

Schedule 1 - New Corporate Hangar and Schedule 2 - Site Work and Utility Improvements
Construction
Roxboro, NC 27573

EWN Corporate Box Hangars
New Construction
Construction
$5,000 to $9,999 est. value
New Bern, NC 28562

Blue Line Aviation
New Construction
Pending Verification
Smithfield, NC

Hangar Replacement and Access Road/Parking Improvements
Renovation, Infrastructure
Post-Bid
Stoneville, NC

Corporate Hangars 27, 28, 29, 30 And 31
New Construction - 59,200 SF
Results
$5,000,000 to $10,000,000 CJ est. value
Greenville, NC

Hickory Airport Hangar
Renovation
Construction
Hickory, NC

T-Hangar and Hangar Taxilanes Site Preparation and Paving
New Construction, Infrastructure
Post-Bid
Burlington, NC

T-Hangar Area Development Fayetteville Regional Airport
Renovation
Results
Fayetteville, NC

Last Updated 09/24/2022 04:06 AM
Project Title

Charlotte Douglas International (CLT ) Storage Building Installation

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $297,351 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 22, 2022 Contract Award Number: 697DCK-22-C-00354 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: E7DDXXR89QD6 Contractor Awarded Name: Edwards Construction Group, LLC Contractor Awarded Address: Fairburn, GA 30213-6443 USA Base and All Options Value (Total Contract Value): $297351.82 The Federal Aviation Administration (FAA) has a requirement for the installation of a storage building at the Charlotte Douglas International (CLT) Air Traffic Control Tower (ATCT) located at Charlotte, NC. The SIR/RFP is posted in accordance with FAA Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services, and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for cost associated with the preparation, submittal or inquiries or responses for this announcement and will not reimburse any firm for cost incurred in responding to this public announcement. All questions regarding the SIR must be submitted in writing to the Contracting Officer (CO), Ms. Thuylinh TranNguyen, at thuylinh.t.trannguyen@faa.gov. All questions must be received no later than March 31, 2022 at 1500 EDT. An optional site visit is scheduled for this requirement. The site visit information can be found it the SIR Section L.3. Offerors interested in attending the site visit must provide written notice to the Contracting Officer in accordance with Section L.3. To be considered for award of this requirement, the offeror must have a current/valid registration in the Systems for Award Management (SAM) database website: www.sam.gov. To be eligible for award, the offeror must submit a proposal in accordance with Section L and Section M of this SIR. Proposal due date is provided in SIR. The estimated magnitude of construction is between $50,000 to $200,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents