Similar Projects
K-6 Site Production Well
Infrastructure
Bidding
Daphne, AL

Groundwater Production Well 15
Infrastructure
Bidding
Daphne, AL

Water Meter Replacement and Pumping Stations Upgrade
Post-Bid
Gordon, AL 36343

GIW Slurry Pump
Post-Bid
Mobile, AL 36603

Consecutive Replacement of Wells #1 and #8
Results
Fairhope, AL 36533

Primary Solids Handling Pump Modifications for Hilliard Fletcher Wastewater Treatment Plant
Results
Less than $576,836 est. value
Tuscaloosa, AL

Refurbishment of Water Wells (Well Numbers 16, 25, 27, and 32)
Infrastructure
Bidding
Dothan, AL 36301

Day Street High Service Pump No. 4 Replacement and Pipe Gallery Rehabilitation
Post-Bid
Montgomery, AL 36109

Wilson Dam Road Retention Pond Expansion
Results
Less than $342,219 est. value
Muscle Shoals, AL 35661

Well 29, 38, and 49 Rehabilitation Project
Post-Bid
Montgomery, AL 36109

Purchase Two (2) Submersible Non-Clog Pumps
Results
Less than $15,994 est. value
Mobile, AL 36618

Well 39A Construction
Post-Bid
Montgomery, AL

Submersible Pump
Results
Mobile, AL 36603

Construction of the Drinking Water Test Well 8
Post-Bid
Dauphin Island, AL

Sandfort Road (Bedrock) Test Well
Results
$50,000 to $75,000 est. value
Phenix City, AL 36869

Last Updated 12/17/2021 09:11 AM
Project Title

Drinking Water Production Well 8

Physical Address View project details and contacts
City, State (County) Dauphin Island, AL   (Mobile County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid A: A permanent monitoring well, geophysical logging and E-Log of approximately 600 feet BGS. Project includes well drilling, casing installation, permanent monitoring well head, drilling logs, and report. Base Bid B: A municipal drinking water production well approximately 600 feet BGS. Project includes well drilling, casing installation, well pumping and development, water quality testing, test pumping, drilling logs, and report.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents