Project Title | Main Courthouse Chiller Rebuild |
Physical Address | View project details and contacts |
City, State (County) | Wichita, KS 67203 (Sedgwick County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sedgwick County, Kansas (hereinafter referred to as "county") is seeking a firm or firms to provide chiller rebuild. The following objectives have been identified for this contract: 1. Acquire HVAC Services meeting the parameters, conditions and mandatory requirements presented in the document. 2. Establish contract pricing with the vendor that has the best proven "track-record" in performance, service and customer satisfaction. 3. Acquire HVAC Services with the most advantageous overall cost to the county Items listed in this section are requirements to completion of services under this contract. Contractor shall furnish labor, parts, material, and equipment necessary to perform the following rebuild of Chiller #1 using the factory suggested rebuild guidelines. This need for rebuild is based on two (2) oil analysis samples that came back with abnormal results on the chiller. Chiller #1 information: Unit Model # YT H3 A3 C3-CN J Compressor Model # YTDJ-CB The rebuild of Chiller #1 shall include but is not limited to the below items and shall use only York factory authorized parts (OEM). 1. Shaft seal 2. PRV shaft 3. Bearings 4. O-rings 5. Clean oil sump 6. Oil 7. Oil filter 8. Gaskets 9. Suction gaskets 10. Oil sump sight glasses 11. Low speed (LS) thrust cover 12. High speed (HS) thrust cover 13. Ring seal balance port 14. Ring eye seal 15. Motor rebuild performed by factory authorized rebuild shop 16. Oil sample for baseline after rebuild completed- sent to Johnson Controls Factory Analysis Team 17. Vibration analysis for baseline after rebuild completed- sent to Johnson Controls Factory Analysis Team Main Courthouse Chiller Rebuild - Rebuild one Chiller at the Main Courthouse 525 N. Main Street Wichita, KS 67203 **Inquiries regarding Bid Documents, Bid/Selection process or any requests for information about this specific project shall be directed in writing only to: Lee Barrier, Purchasing Agent 525 North Main Street, Suite 823 Wichita, KS 67203 Telephone: (316) 660-7258 Fax: (316) 383-7055 E-mail: Lee.Barrier@sedgwick.gov Items listed in this section are requirements to completion of services under this contract. Contractor shall furnish labor, parts, material, and equipment necessary to perform the following rebuild of Chiller #1 using the factory suggested rebuild guidelines. This need for rebuild is based on two (2) oil analysis samples that came back with abnormal results on the chiller |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |