Similar Projects
Sagebriar Planned Unit Development
New Construction, Infrastructure
Design
$200,000,000 CJ est. value
Greenwood, IN 46143

Johnson County Courthouse Exterior Sitework Project
Infrastructure
Bidding
$250,000 CJ est. value
Franklin, IN 46131

Two Cent Road Sanitary Sewer Upgrades Contract 2-2022
Infrastructure
Bidding
$5,000,000 CJ est. value
Bargersville, IN 46106

Center Grove Middle School North - Early Bid Package No.2 - Site and Foundations
Infrastructure
Post-Bid
$400,000 CJ est. value
Greenwood, IN 46142

Wastewater Treatment Plant Improvements
Renovation, Infrastructure
Post-Bid
$5,500,000 CJ est. value
Trafalgar, IN 46181

Westside Regional Interceptor - Phase 1
Infrastructure
Results
$2,292,995 CJ est. value
Franklin, IN 46131

Pavement Patching - 1-65
Infrastructure
Results
$2,928,000 CJ est. value
Franklin, IN 46131

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Construction Inspection Services US 31 in Johnson County - 1800082 - Indiana Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$42,044,000 CJ est. value
Franklin, IN 46131

Johnson Memorial Hospital - Behavioral Psychology Building
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Franklin, IN 46131

4kV to 12kV Line Conversion Project
Infrastructure
Post-Bid
$350,000 CJ est. value
Edinburgh, IN 46124

Well No. 7A
Infrastructure
Results
$26,937 CJ est. value
Bargersville, IN 46106

Founders Point Apartments
New Construction, Infrastructure - 71,400 SF
Pending Verification
$20,000,000 CJ est. value
Franklin, IN 46131

Johnson Memorial Hospital – Behavioral Psychology Building Project
New Construction, Infrastructure
Bidding
$4,890,000 CJ est. value
Mount Pleasant, IN 46131

Reconstruction of Alleyway between Baldwin and Carlisle Street
Infrastructure
Post-Bid
$500,000 CJ est. value
Bargersville, IN 46106

Last Updated 06/01/2023 01:06 PM
Project Title

Wellness Center - Center Grove Community School Corporation - Structural Steel (BP#02)

Physical Address View project details and contacts
City, State (County) Greenwood, IN 46143   (Johnson County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $328,800 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

By submitting a Bid on the enclosed Bid Form, Bidder satisfies requirement for Indiana Form No. 96 (Revised 2013), as prescribed by State Board of Accounts of Indiana. This shall clearly show Bidder's financial resources, construction experience, organization, and equipment available for Work contemplated. A bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, "Contractors Combination Bid Bond and Bond for Construction," or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 10 percent of the total bid. Bid security shall be forfeited if bid is withdrawn after closing time on date for receiving bids. Successful bidders are required to furnish separate satisfactory Performance Bond A312 and Payment Bond A312 from an acceptable surety in an amount equal to 100 percent of the full contract sum. The Owner reserves the right to reject each and every bid, and to waive informalities, irregularities, and errors in the bidding to the extent permitted by law. This includes the right to extend the date and time for receipt of bids. No bidder may withdraw their bid within 60 days after the actual date of the bid opening thereof

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents