Similar Projects
Nelson Property Group Residential
New Construction - 7,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rock Hill, SC

Charleston Naval Complex Redevelopment/Naval Base Museum Authority - Museum Project
New Construction, Infrastructure
Conception
$80,000,000 CJ est. value
Charleston, SC 29401

Spencer's Trail
New Construction
Design
Anderson, SC

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Design
$600,000 CJ est. value
Greer, SC 29651

Residuals Handling Improvements to the George H. Connelly Water Treatment Plant
Infrastructure
Bidding
$800,000 CJ est. value
Newberry, SC 29108

Residuals Handling Improvements to the George H. Connelly Water Treatment Plant
Infrastructure
Bidding
$800,000 CJ est. value
Newberry, SC 29108

Signal Upgrades - District 3
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Roebuck, SC 29376

Termite Inspection and Treatment Services
Term Contract
Sub-Bidding
Charleston, SC 29401

Wastewater Treatment Plant Sludge Dewatering And Clarifier Upgrades
Post-Bid
$1,800,000 est. value
Bishopville, SC

Construction of 25,000SF Building Pad
Post-Bid
Less than $300,000 est. value
Beaufort, SC 29906

McRae Road Pump Station Upgrade
Results
Camden, SC 29020

Murrells Inlet WWTP Clarifier Rehabilitation
Results
Georgetown, SC

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Summerville, SC 29485

Wooddale Subdivision
New Construction, Infrastructure
Pending Verification
$172,000,000 CJ est. value
Johns Island, SC 29455

Pump Station 104 Rehabilitation - Dorchester County
Renovation
Conception
$500,000 CJ est. value
Summerville, SC 29483

Last Updated 08/04/2022 01:30 AM
Project Title

Marion Waste Water Treatment Plant (WWTP) Protection Berm

Physical Address View project details and contacts
City, State (County) Marion, SC 29571   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of a new protection berm, concrete retaining wall & 2 pump stations at the Marion WWTP. This project shall include site work, site piping, electrical, controls and all appurtenances for a complete functioning pump station. This project is in part being funded by the Community Development Block Grant Program (CDBG). All federal CDBG requirements will apply to the contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents