Similar Projects
US 119 Corridor G Signing
Infrastructure
Design
$3,500,000 CJ est. value
Danville, WV 25053

Consulting Engineering Services - Main Street Streetscape Phase II
Infrastructure
Post-Bid
$476,000 est. value
Madison, WV 25130

Paving and Patch Work
Infrastructure
Post-Bid
$395,000 CJ est. value
Whitesville, WV 25209

Bentley Road Bridge
New Construction, Infrastructure
Results
WV

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Family Dollar / Sylvester
New Construction, Infrastructure - 10,431 SF
Post-Bid
$500,000 CJ est. value
Sylvester, WV 25193

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Pond Fork Bridge
New Construction
Results
WV

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

2022 RPM
Infrastructure
Results

Asphalt Paving - D-1 Recall Striping 2023
Infrastructure
Results
$334,635 CJ est. value
Van, WV 25028

Raleigh County Commission-Clear Fork Rail Trail
Infrastructure
Results
$1,611,000 CJ est. value
Whitesville, WV 25209

Last Updated 03/23/2023 02:36 AM
Project Title

Eastwood Lane Bridge

Physical Address View project details and contacts
City, State (County) Bob White, WV 25028   (Boone County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP2603003D Type of Work : REPL As of March 23, 2023, the project is in final planning status. The funding obligation date for the construction is May 28, 2024. WVDOT - Eastwood Lane Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents