Similar Projects
Last Updated | 01/09/2020 12:47 PM |
Project Title | Road Improvements |
Physical Address | View project details and contacts |
City, State (County) | Rockwall, TX (Rockwall County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of removing existing 6 inches of concrete (road width 25 foot with a roll curb) and replacing with 6 inches of concrete with minimum strength of 4000# with #3 rebar on 18 inch centers. There will be two areas repair. The first starts at SH205 and goes east for 480 feet to Hebron Street. The second goes from address 2120 Chisholm Trail to 2125 Chisholm Trail 390 feet of existing concrete street with a roll curb and replace. The sub grade will be evaluated after removal and if it needs to be repaired the County Road and Bridge department will remove and replace with compacted base rock back to the original grade. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |