Similar Projects
CIP Valve Replacement
Post-Bid
Palm Bay, FL

Prequalification of Companies to Bid Construction Services for the Pineda Causeway Water Transmission Mains Project
Post-Bid
Melbourne, FL 32901

Brevard County Utility Services Department Underground Utility Contractor Services Fiscal Year (FY) 2020
Term Contract
Results
Viera, FL 32940

Thurm Boulevard Force Main Replacement
Results
Cape Canaveral, FL 32920

Gate Valves
Post-Bid
Palm Bay, FL

Sherwood Park Water Quality Enhancements
Results
$1,667,834 est. value
Melbourne, FL 32901

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Subaqueous Crossings Pipeline Repair Services - FEMA
Term Contract
Results
Melbourne, FL 32901

Fire Station #5 Fireline
Results
Palm Bay, FL 32909

Continuous Contract for Water, Wastewater and Stormwater Repairs for Emergency Work
Term Contract
Results
Melbourne, FL 32901

General Contractor - Utility Systems
Term Contract
Results
Cocoa, FL 32922

Jupiter Bridge C-1 Abandoned Water Main Removal
Results
Less than $30,000 est. value
Palm Bay, FL

North Courtenay Parkway Force Main and Reuse Extension, Phase 3
Results
$1,219,042 est. value
Merritt Island, FL 32953

South Carpenter Water Main Extension
Results
Less than $517,000 est. value
Titusville, FL 32780

Pipe Connection To Fire Station Pond
Results
$365,878 est. value
Palm Bay, FL 32905

Last Updated 12/17/2019 10:00 AM
Project Title

Columbia Lane - Brandywine Lane Water Main Project

Physical Address View project details and contacts
City, State (County) West Melbourne, FL 32904   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing approximately 4,900 linear feet (LF) of new water main (primarily 16” PVC) on Columbia Lane and Brandywine Lane in West Melbourne, Florida. Included in that 4,900 LF is approximately 980 LF of 16” fusible PVC water main that will be directional drilled under U.S. Highway 192 and Interstate 95. The remaining portions of the water main will be primarily restrained PVC pipe installed by trenching, with small sections of ductile iron pipe and smaller diameter piping. Various demolition and restoration of items within the project areas will be required (including sod, trees, sidewalks, pavement, etc.)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents