Similar Projects
City Hall Interior and Exterior Repairs
Alteration
Bidding
$70,000 est. value
Lake Charles, LA 70601

Metal Roof Repairs and Interior Repairs
Alteration
Post-Bid
Sulphur, LA

Equipment and Turnkey Installation
Alteration
Post-Bid
Crowley, LA

Miscellaneous Acoustical Ceiling Work
Alteration
Results
New Orleans, LA

Lakefront Parking Garage - Phase II
New Construction, Alteration
Results
Lake Charles, LA

Repair of CMU Wall, Construct Interior Structural Steel Support and Replace Roof at The Wastewater Treatment Plant (Plant Shop - Vehicle Storage Building)
Renovation, Alteration
Post-Bid
Alexandria, LA

Rusted Areas On Wall Panels and Trim, Fabricate (6) Six Cover Panels 6 Tall in Damaged Panell Areas
Alteration
Results
Gretna, LA

Claiborne Creek Phase 2 - Remove Balconies / Repair Water Damage
Alteration
Post-Bid
West Monroe, LA 71291

Fall Protection
Alteration
Results
New Orleans, LA 70118

Storm Damage Repair (Roofing/Interiors-Hurricane 2020)
Alteration
Post-Bid
Merryville, LA

Restoration of Hurricane Damage to the Cafeteria/Band Building at Gueydan High School
Renovation, Infrastructure, Alteration
Results
LA

Trim Molding for DOC/LSP
Alteration
Post-Bid
Baton Rouge, LA 70802

Annual Insulation for CD Rehabilitation
Term Contract
Results
Lafayette, LA

Exterior and Interior Repairs Southern University Lab School
Alteration
Post-Bid
$520,000 est. value
Baton Rouge, LA 70813

Nonpersonal Services and Products for Remove of the Carpet (Approximately 800 Square Feet) from walls, making repairs to Drywall, Texturing any Areas Which Require It, and Repainting the Interior
Alteration
Results
Shreveport, LA

Last Updated 07/06/2022 07:28 AM
Project Title

Robinson Hall Bathroom Renovations

Physical Address View project details and contacts
City, State (County) Grambling, LA 71245   (Lincoln County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall renovate 19 bathrooms in total. Three of the 19 bathroom should be ADA compliance. The Contractor is required to furnish all materials, labor, transportation, tools, and equipment and perform all work.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents