Similar Projects
U-Haul - King Street / Charleston
New Construction, Renovation, Infrastructure - 171,392 SF
Conception
$12,000,000 CJ est. value
Charleston, SC 29403

Stono Shores Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Charleston, SC 29412

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Galeana Chrysler Dodge Ram Jeep / Mount Pleasant
New Construction, Infrastructure
Post-Bid
Awendaw, SC 29429

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

Roadwork - Ashley Hall Plantation Road Right Turn Lane
Infrastructure
Results
Charleston, SC 29407

Spinx #368 / Charleston
New Construction, Infrastructure - 4,000 SF
Construction
$3,000,000 CJ est. value
Charleston, SC 29401

The Hamlet at Maybank Highway / Johns Island
New Construction, Infrastructure
Construction
$30,000,000 CJ est. value
Johns Island, SC 29455

Cumberland Residential - The Clarke
Demolition, New Construction, Infrastructure - 3,000 SF
Pending Verification
$10,000,000 CJ est. value
Charleston, SC 29401

Cumberland Residential - The Clarke
Demolition, New Construction, Infrastructure - 3,000 SF
Pending Verification
$10,000,000 CJ est. value
Charleston, SC 29401

New District 10 Elementary School - Charleston County School District
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Charleston, SC 29401

Huger Street Hotel
New Construction, Infrastructure
Design
$37,000,000 CJ est. value
Charleston, SC 29403

FLETC Training Venue Replication
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
North Charleston, SC 29405

Last Updated 05/01/2023 06:02 PM
Project Title

Savannah Highway Roadside Drainage Maintenance Project

Physical Address View project details and contacts
City, State (County) Charleston, SC 29414   (Charleston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $86,600 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 6, 2023, the project has been awarded. A timeline for construction has not been confirmed. The City of Charleston is accepting Bids for construction services for the Savannah Highway Roadside Drainage Maintenance Project. The Work will include flexible, perforated pipe installation; inlet repair and installation; sidewalk, curb, and driveway replacement; bank stabilization with geocell fabric; erosion control and site stabilization; traffic control; all within three locations along 1700-feet of US Hwy 17 Savannah Highway, as shown in the Drawings. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents