Similar Projects
Wrong Way Driving Traffic Enhancements
Results
$1,000,000 to $5,000,000 est. value

Signal Pole Repair
Results
Denver, CO 80204

Traffic Signal Controls
Results
Denver, CO 80204

Mill Levy 23 - Yosemite Corridor and Mill Levy 14 - Downing at Evans and Yale - Traffic Signal Upgrades
Results
$2,200,000 to $2,700,000 est. value
Denver, CO 80202

Traffic Signals Upgrade
Post-Bid
$983,000 to $1,201,000 est. value
Denver, CO 80202

On-Call Temporary Traffic Control Services
Post-Bid
Denver, CO 80204

Traffic Mesoscopic/Micro
Post-Bid
Denver, CO 80204

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

Signal and Intersection Improvement Package 1 in Three Locations
Results
Less than $1,000,000 est. value
CO

Traffic Control Services
Post-Bid
Denver, CO

Aurora Signals 2019
Results
Less than $1,000,000 est. value

Traffic Control Services
Post-Bid
CO

R5 Intersection Warning System
Infrastructure
Post-Bid
Denver, CO 80239

Traffic Control Services
Infrastructure
Post-Bid
Denver, CO

Mill Levy 16A and 17A Traffic Signals Construction
Infrastructure
Bidding
$2,100,000 to $2,700,000 est. value
Denver, CO 80238

Last Updated 10/15/2021 06:56 PM
Project Title

New Traffic Signals (NTS)-1 and Mill Levy 12

Physical Address View project details and contacts
City, State (County) CO 80238   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,450,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is the 2019-2021 Traffic Signal Upgrade – Mill Levy 12 & NTS-1 Project. The overall objective of this project is the reconstruction five (5) traffic signals and install new ones (2) within the City and County of Denver - total seven (7) traffic signals. The locations of these traffic signals are at the following intersections: 1. Zuni Street at 32nd Avenue 2. Zuni Street at 35th Avenue 3. Zuni Street at 44th Avenue 4. Zuni Street at 46th Avenue 5. Zuni Street at 48th Avenue 6.11th Ave Josephine(new) 7. Alameda at Newport(new). In addition to the traffic signal upgrades, there will be improvements made to curb ramps, sidewalk, curb and gutters, curb returns, and damaged sidewalks, and curb and gutter at each intersection for enhanced pedestrian access. Ramp improvements will be constructed to current CCD standards and specifications. In addition, there are existing storm sewer inlets and manholes at the intersections require relocation or resetting. A new storm inlet will also be installed at the intersection of 32nd Avenue & Zuni Street.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents