Similar Projects
Replace Greenhouse Homes HVAC
Infrastructure
Design
$2,000,000 to $5,000,000 est. value
North Chicago, IL 60064

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

2020 HVAC Preventative Maintenance Services
Term Contract
Post-Bid
Fox Lake, IL

Building 310 Exhaust Fan
Results
Gurnee, IL

2021 HVAC Upgrades Diamond Lake School
Results
Mundelein, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

Leisure Center HVAC Roof-Top Unit
Results
Zion, IL 60099

2021 HVAC Upgrades at Antioch Community HS
Post-Bid
Lake Villa, IL

Mechanical HVAC System Replacement
Results
Wauconda, IL 60084

2021 Rooftop Unit Replacement
Post-Bid
Antioch, IL 60002

Station 2 HVAC
Alteration
Results
Vernon Hills, IL 60061

Rooftop Solar Panel Installation and Operations
Post-Bid
Highland Park, IL 60035

HVAC Maintenance for the City of Lake Forest and the Village of Glenview
Alteration
Results
Lake Forest, IL

2021 HVAC Improvements at Rondout ES
Post-Bid
Lake Forest, IL 60045

Advanced Technology Center HVAC
Alteration
Results
Grayslake, IL

Last Updated 04/25/2022 10:39 AM
Project Title

New Furnaces and Condensers

Physical Address View project details and contacts
City, State (County) Libertyville, Mundelein, IL 60060   (Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Installation Furnish and Install new HVAC galvanized sheet metal ductwork per SMACNA standards. Furnish and Install (2) new Carrier 110,000 BTU 80% MDL # 58SCOA110E2120 furnaces with 4Ton cased coils MDL# CNPV4821ALA, R410A Refrigerant. Furnish and Install (2) new Carrier 13 seer MDL# 24ABB348ABN3 and (2) new condenser pads. Furnish and install new galvanized sheet metal plenum on the (2) new furnaces. Furnish and install (2) new return air drops from the return trunk line in the attic (25x10) verify on site. HVAC Piping Reconnect condensing units and evaporator coils. Pressure test and pull vacuum on refrigerant system to 500 Microns. HVAC Controls (stand-along controls) Furnish and install (2) new 7 day programable thermostats. Furnish start up for the new systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents