Similar Projects
Plugging Wells
Term Contract
Post-Bid

Plugging Wells
Term Contract
Post-Bid

RRVWSP - MRIPS Wet Well and Site Development
Results
$3,000,000 to $4,000,000 est. value
Carrington, ND

AFB Landfill Gas Wellfield Expansion
Infrastructure
Results
$455,000 est. value
Fargo, ND 58102

Well Equipment Removal Package 1
Demolition
Post-Bid

Reclaim 11 Wells - East
Infrastructure
Results
ND

Well Equipment Removal Package 2
Demolition
Post-Bid

Reclaim 10 Wells -West
Infrastructure
Results
ND

Well Equipment Removal Package 3
Alteration
Post-Bid
Bismarck, ND

Reclamation of Wells - Package 1
Infrastructure
Results
Bismarck, ND

Reclamation of Wells - Package 2
Infrastructure
Results
Bismarck, ND

Last Updated 09/20/2021 09:13 AM
Project Title

Reclamation of Wells - Package 4

Physical Address View project details and contacts
City, State (County) Bismarck, ND   (Burleigh County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This bid should include the full cost to reclaim the well sites and facility sites. 1) contact landowner and go over the reclaim plan. 2) Remove surfacing material from site. 3) Remove contamination down to 4’ or to levels of 10,000 ppm with no free product for TPH and Electrical conductivity (EC) of 2000 micro siemens/cm. 4) Recontour the site, rip the site to alleviate compaction, and spread 6 inches of topsoil. 6) Seed with native grass or seed specified by landowner (if tillable no seeding will be needed). Below is the list of sites: 5940– Bryan 3 – NENE Section 17 161N 91W. 8916 – Ellithorpe 1 – NENW Section 8 161N 91W. 8759 – Anderson 3-24 – NENW Section 24 162N 92W. 2701 – Raymond Moritz 1 – NENW Section 13 162N 92W. 2756 – A.K. Holen 1 – NENE Section 13 162N 92W. 2986 – H. Anderson – CNW Section 18 162N 91W. 1511 – Pan American-Willie Holte 1 – NWSE Section 5 162N 91W. 1485 – Northwest-Willie Holte 1 – SESE Section 5 162N 91W. 10841 – Bly 30-11 – NESW Section 30 163N 91W. 10702 – En Arnold 28-10 H – NESE Section 28 162N 90W.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents