Similar Projects
Michael a Mikey Hart Mem Br EB/WB
Infrastructure
Design
$7,920,600 CJ est. value
Buckhannon, WV 26201

Michael a Mikey Hart Mem Br EB/WB
Infrastructure
Design
$7,920,600 CJ est. value
Buckhannon, WV 26201

Resurfacing - Buckhannon-Elkins Road
Infrastructure
Bidding
$13,000,000 CJ est. value
Buckhannon, WV 26201

Resurfacing - Buckhannon-Elkins Road
Infrastructure
Bidding
$13,000,000 CJ est. value
Buckhannon, WV 26201

FY2021 Capital Fund Program - Vinyl Fence and Playground Equipment Replacement
Infrastructure
Post-Bid
$85,000 CJ est. value
Buckhannon, WV 26201

USPFO Security Trailer Utilities Install and Connection
Infrastructure
Post-Bid
$200,000 CJ est. value
Buckhannon, WV 26201

Alton Deck Girder
New Construction, Infrastructure
Results
WV

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Stockert Youth & Community Center
New Construction, Infrastructure
Pending Verification
$3,600,000 CJ est. value
Buckhannon, WV 26201

Sheetz Renovation / Buckhannon
Infrastructure, Build-out
Pending Verification
$1,000,000 CJ est. value
Buckhannon, WV 26201

Slip Repair and Regrade Project
Infrastructure
Bidding
$120,000 CJ est. value
Imperial, WV 26237

Corridor H Site Analysis
Infrastructure
Post-Bid
$427,000 CJ est. value
Buckhannon, WV 26201

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

2022 RPM
Infrastructure
Results

Last Updated 02/28/2023 03:12 AM
Project Title

Middle Fork River Truss

Physical Address View project details and contacts
City, State (County) Ellamore, WV 26201   (Upshur County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2025 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP0526003D Type of Work : Replace Br As of February 28, 2023, the project is in Final planning status. The funding obligation date for the construction is March 28, 2025. WVDOT - Middle Fork River Truss *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents