Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Greenhouse/Headhouse Heating and Ventilation Modifications and Repairs
Infrastructure
Design
$100,000 to $250,000 est. value
Raleigh, NC 27606

Broughton High School HVAC Upgrades
Alteration
Bidding
$1,200,000 est. value
Raleigh, NC 27605

Bolton HVAC Project
Alteration
Bidding
$150,000 est. value
Winston-Salem, NC 27103

CTC Computer Room Air Conditioner
Term Contract
Post-Bid
Archdale, NC 27263

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

EMD Facility HVAC Upgrades
Results
Wilmington, NC

Administration Building AHU Replacement
Results
$276,915 est. value
Durham, NC 27701

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Jack Hunt Cooling Tower
Alteration
Bidding
Shelby, NC 28152

Design-Build for Leland Middle School HVAC Improvements
Post-Bid
Leland, NC 28451

Replacement of Four Existing HVAC and Duct Systems
Results
Lumberton, NC

Replace Air Header and Diffusers BNR Reactors WWTP
Infrastructure
Bidding
$250,000 to $500,000 est. value
Cherry Point, NC 28533

HVAC Replacement (South Campus)
Post-Bid
Creedmoor, NC 27522

Courthouse Cooling Tower Replacement
Results
Beaufort, NC 28516

Last Updated 04/26/2022 08:59 AM
Project Title

Replace Oil Boiler and Oil Water Heater, Bldgs A71 and A66

Physical Address View project details and contacts
City, State (County) Camp Lejeune, NC   (Onslow County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes removal of existing fuel tank serving boilers and replace with propane tank, provide new equipment pads, chiller (A71 only), boilers and pumps, piping,and replacement of boiler exhaust stack. Upgrade or replace electrical breakers, panels, and wiring as needed. Remove and replace the existing domestic hot water heater with a gas-fired water heater and all peripheral components and incidental related work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents