Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Mitchell Hill Road Construction - Town Of Scarborough
Infrastructure
Conception
$1,500,000 CJ est. value
Scarborough, ME 04074

Highland Avenue Land Reclamation
Infrastructure
Design
Scarborough, ME 04074

RFP Design - Shared Use Pathway Design from Parkside to the Portland Transportation Center
Infrastructure
Bidding
$230,000 CJ est. value
Portland, ME 04101

Washington Avenue Roadway, Intersection/Signals, Sidewalk and Streetscape Project
Infrastructure
Bidding
$2,358,000 CJ est. value
Portland, ME 04103

Windham Field Allen SRRF Underground Sprinkler and Domestic Water Service Upgrade
Post-Bid
Windham, ME 04062

Water / Sewer Service Installation at 145 Allagash Drive
Infrastructure
Post-Bid
Brunswick, ME 04011

Water Main Replacements in Ledgewood Drive - Falmouth (Contract A) and Diamond Street - Portland (Contract B)
Results
Less than $700,000 est. value
Falmouth, Portland, ME 04105

Phase 2 Water Main Replacement Project
Results
Bridgton, ME

Stevens Square at Baxter Woods Apartments / Portland
New Construction, Infrastructure - 806,560 SF
Construction
$60,800,000 CJ est. value
Portland, ME 04103

Nouria Energy Convenience Store and Amato’s Restaurant
Demolition, New Construction, Infrastructure - 6,000 SF
Pending Verification
$1,100,000 CJ est. value
Gorham, ME 04038

2022 Referendum - Scarborough Public Library Expansion - Town of Scarborough
Addition, Demolition, Renovation, Infrastructure - 22,176 SF
Pending Verification
$13,900,000 CJ est. value
Scarborough, ME 04074

Scarborough Community Recreation Center - Town of Scarborough
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Scarborough, ME 04074

Riverside Sidewalk Project
Infrastructure
Bidding
$150,000 CJ est. value
Portland, ME 04101

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Last Updated 08/09/2022 02:14 PM
Project Title

Great Diamond Island - Little Diamond Island Submerged Water Main Replacement

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,452,450 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of, but is not necessarily limited to, the following: 1. Installation of parallel 14" HDPE water mains between Great Diamond Island and Little Diamond Island. 2. Installation of ductile iron pipe, fittings and connections at both ends of the submerged mains. Each bid must be accompanied by Bid Guaranty in form of certified check or bid bond in amount of five percent (5%) of the total amount of the bid. Aperformance bond in an amount equal to one hundred percent (100%) of the contract price, and labor and material payment bonds in like amount will be required prior to execution of the Agreement. Bidder must have a Portland excavator's license and obtain an excavation permit and comply with all rules and regulations associated with the municipal street opening ordinances. If the cost of ductile iron or hdpe pipe materials escalates between the bid date and shipping date through no fault of the contractor, the Contractor shall notify PWD in writing of the total increase. The Contractor shall supply PWD with invoices, bills of sale or pricing sheets to substantiate the notice. The contract will be adjusted through a change order to account for the cost difference between the shipping price and bid price. The Contractor will be paid for stored materials per the agreement. Bidder agrees to substantially complete the work on or before December 1, 2023 and achieve final completion by December 15, 2023. No work is allowed between May 15 and September 15. If substantial completion is not achieved by the specified date, the Bidder further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day until substantial completion is achieved. No bids may be withdrawn within sixty (60) days after date of opening thereof. Right is reserved to refuse or reject any or all bids or to waive any informality in proposals received and to award work at discretion of the General Manager acting in the best interests of the Portland Water District.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents