Similar Projects
Petefish Mixed-Use / Fairview
New Construction
Conception
$500,000,000 est. value
McKinney, Van Alstyne, TX 75495

Heritage Ranch
New Construction
Design
$100,000,000 est. value
Sherman, TX 75092

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,629 SF
Design
$2,500,000 CJ est. value
Sherman, TX 75092

Pavement Repair, Sherman Aem
Infrastructure
Bidding
$30,000 est. value
Sherman, TX 75090

Sherman WTP Expansion Package 1
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,250,000 CJ est. value
Sherman, TX 75092

SH 160 - Preventive Maintenance
Infrastructure
Sub-Bidding
$10,196,404 CJ est. value
Whitewright, TX 75491

SH 160 - Preventive Maintenance
Infrastructure
Sub-Bidding
$10,196,404 CJ est. value
Whitewright, TX 75491

Parking Lot Repairs
Infrastructure
Post-Bid
Sherman, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Hilre Drive Extension
Results
$440,000 est. value
Sherman, TX

Asphalt
Results
$247,200 est. value
TX

Sparklight Customer Service Facility
Renovation - 3,330 SF
Construction
Sherman, TX 75090

Sycamore Street Offices
New Construction - 31,911 SF
Construction
$5,000,000 est. value
Sherman, TX 75090

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Hickory Hill Residential
New Construction, Infrastructure
Pending Verification
$95,000,000 CJ est. value
Sherman, TX 75092

Last Updated 08/16/2022 04:32 PM
Project Title

Classic Chevrolet Cadillac of Denison

Physical Address View project details and contacts
City, State (County) Denison, TX 75021   (Grayson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $18,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Construction of new automobile sales dealership on new site consisting of showroom, offices, service drive, 52 service bays, and associated site work. As of May 2022, construction documents are complete. A general contractor has been selected.

Details

75,200 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents