Similar Projects
River Road Culvert Repairs Construction Project
Infrastructure
Bidding
$200,000 est. value
Pensacola, FL 32598

CR97 and CR297A Intersection Improvements
Infrastructure
Bidding
$800,000 est. value
Pensacola, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Bayou Boulevard, Lee, Lloyd and Stanley Street Outfalls to Bayou Texar Stormwater Treatment Enhancement
Results
Pensacola, FL

Klondike Road at Cedarbrook Estates Pond
Results
Pensacola, FL 32526

Construction of Upland Road Drainage Improvements
Infrastructure, Alteration
Bidding
$200,000 est. value
Cantonment, FL 32533

12th Avenue at Fairfield Drive Drainage Improvements
Infrastructure
Post-Bid
West Pensacola, FL 32505

Fairchild Street Swale Upgrade Project
Results
Less than $122,000 est. value
Pensacola, FL 32504

Blue Springs Drainage Improvements at Crescent Lake (Construction)
Infrastructure
Post-Bid
$700,000 est. value
Pensacola, FL

Pensacola Bay Living Shoreline Greenshores II
Results
Pensacola, FL 32502

Burgess Road Sidewalk & Drainage Improvements
Results
Less than $1,570,000 est. value
Pensacola, FL 32598

Washington High School Pond Rehabilitation
Results
Pensacola, FL 32504

Floridian Ditch Restoration Phase II (Sarasota Project)
Infrastructure
Results
Bellview, FL

Beach Haven Phase IIA and Phase IIB Northeast Drainage and Sanitary Sewer Improvements
Infrastructure
Results
Pensacola, FL

Reported 06/21/2022 12:00 AM
Project Title

Southwest Greenway Repairs Project - Glynn Key Pond

Physical Address View project details and contacts
City, State (County) Cantonment, FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to repair Glynn Key Pond which was damaged during Hurricane Sally. The pond is located in the vicinity of N. Navy Boulevard and Cameron Lane (30.39, -87.28). The damaged area is located in the southwest corner of the pond. Tasks include: Re-grade, reconstructs, and stabilize eroded area adjacent to the southwest fence line, repair a section of asphalt pavement, and remove & replace damaged fencing.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents