Similar Projects
Mockingbird Hills Subdivision Improvement - 509 - City of San Marcos
Infrastructure
Conception
$8,420,000 est. value
San Marcos, TX 78666

Lamar Boulevard Condos
New Construction
Design
$15,000,000 est. value
Austin, TX 78704

Stream Buda / Building 5
New Construction - 117,406 SF
Design
$7,044,360 est. value
Buda, TX 78610

RM 12 - Widen Road - Add Lanes
Infrastructure
Bidding
$4,135,673 CJ est. value
San Marcos, TX 78666

Medina Hall Renovation
New Construction, Renovation - 2,400 SF
Bidding
$900,000 est. value
San Marcos, TX 78666

Construction of Kissing Tree West Centerpoint Road Phase 3A
Infrastructure
Post-Bid
San Marcos, TX 78666

Sunfield WWTP Expansion to 0.99 MGD - Package 3B - Treatment Plant Construction and Start-up
New Construction, Infrastructure
Post-Bid
$25,000,000 CJ est. value
Buda, TX 78610

San Marcos Area Office Refresh
Results
Less than $58,492 est. value
San Marcos, TX 78666

Buda Welcome Center
Renovation
Results
Buda, TX 78610

Redbird Office Renovation at Hays Commerce Center Building 1
Renovation - 48,709 SF
Construction
Kyle, TX 78640

Fuse CoWorking / Sawyer Ranch Building 2
Renovation - 19,472 SF
Pending Verification
$1,500,000 est. value
Dripping Springs, TX 78737

Medina Remodel-SAF 2020-008
Renovation - 2,400 SF
Design
$450,000 est. value
San Marcos, TX 78666

North Hays ESD #1 Ems Facilities #72 & #73 And Administration Building
New Construction - 9,400 SF
Post-Bid
$7,000,000 to $9,000,000 est. value
Austin, Dripping Springs, TX 78737

Brush Square - Phase 1 Implementation
Infrastructure
Results
$2,200,000 est. value
Austin, TX

Lookout
New Construction - 26,000 SF
Design
$44,550,000 est. value
Austin, TX 78737

Last Updated 07/21/2022 02:33 PM
Project Title

Wimberley Square

Physical Address View project details and contacts
City, State (County) Wimberley, TX 78676   (Hays County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 21 2022, this project has not submitted any building applications to the City of Wimberley. An architect has been selected. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3,223 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents