Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington
Infrastructure
Design
$2,190,000 est. value
Bloomington, IL 61701

Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Extension
Infrastructure
Post-Bid
Downs, IL

Uptown Normal Trail East and West Redevelopment RFPs
Infrastructure
Post-Bid
Normal, IL 61761

White Oak Road and Hovey Avenue Water Main Extension
Infrastructure
Results
Normal, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Bridge Superstructure Replacement at Kickapoo Creek
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Normal, IL 61761

Last Updated 03/06/2023 09:37 AM
Project Title

Karr Street Reconstruction

Physical Address View project details and contacts
City, State (County) Heyworth, IL 61745   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,636,316 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 12, 2022, bids received were rejected. No definite date for the rebid. Sealed Bids are being received for the following project: Karr Street Reconstruction Contract 2022-X General Project Description: This project consists of furnishing all work necessary for the completion of the reconstruction of Karr Street and other associated local streets. The proposed improvement consists of the following approximate quantities: 3,784 cy earth excavation, 2,725 sq yd sodding, salt-tolerant, 5,165 sq yd aggregate base course, type B, 10", 1,981 feet of storm sewers with various diameters, classes, and types, 26 manholes and frames of various types and diameters, 31 inlets of various types with various frames and grates, 3,321 feet curb and gutter of various types. As an alternate 4,803 sq yd PCC pavement, 7" and 2,192 sq ft stamped colored PCC pavement or 4,803 sq yd HMA pavement (full depth), 244 sq yd stamped asphalt crosswalk, 10,806 pounds bituminous materials (prime coat), and 4,322 pounds bituminous materials (tack coat) and all other necessary items and incidentals required to complete this project according to the plans and specifications. This is a prevailing-wage project. The Village reserves the right to reject any or all bids received. The bid award will be made by the Village Board, and the decision of the Board will be final. Reconstruction of Karr St. new PCC or HMA pavement, sidewalks, PCC sidewalk, the construction of a closed storm sewer system. This includes partial reconstruction of Prairie, Main, Clarke, Sunset and Magnolia Streets

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents