Similar Projects
Arkansas River Trail Project Phase 4-Rebid
Infrastructure
Bidding
$1,267,159 CJ est. value
Pueblo, CO 81006

Arkansas River Trail Project Phase 4-Rebid
Infrastructure
Bidding
$1,267,159 CJ est. value
Pueblo, CO 81006

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Platteville Boulevard Turn Lanes
Results
Pueblo West, CO 81007

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

RFP Engineering - Civil Engineering and Design of Northern Avenue Trail, Phase 3
Infrastructure
Pending Verification
$625,000 CJ est. value
Pueblo, CO 81006

RFP Engineering - Civil Engineering and Design of Northern Avenue Trail, Phase 3
Infrastructure
Pending Verification
$625,000 CJ est. value
Pueblo, CO 81006

West 18th Street Extension
Infrastructure
Bidding
$1,250,000 CJ est. value
Pueblo, CO 81003

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Santa Fe Avenue and Mesa Avenue Streetscape (CDBG)
Results
$50,000 to $60,000 est. value
Pueblo, CO 81008

Joe Martinez Boulevard Extension Project - Pueblo County
Infrastructure
Pending Verification
$6,200,000 CJ est. value
Pueblo West, CO 81007

Grove Neighborhood Sidewalks and Curb Ramps (CDBG)
Infrastructure
Bidding
$300,000 CJ est. value
Pueblo, CO 81006

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Platteville Boulevard Turn Lanes
Infrastructure
Results
Pueblo West, CO 81007

Last Updated 09/19/2022 09:39 AM
Project Title

New Boulevard Extension (East of Joe Martinez Boulevard)

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81005   (Pueblo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

New Boulevard Extension (East of Joe Martinez Blvd) the Purpose of This Project is to Extend Joe Martinez Blvd From Purcell Blvd to Pueblo Blvd (Sh45), as a 4-lane Divided Highway With a 10' Multi-modal Trail Along the North Side of Joe Martinez Blvd. The Work Will Be Within the Honor Farm Master Open Space and Will Include the Following: Two Traffic Signal Installations, One at Purcell and One at Sh 45; a Twin Cell M & S Standard Cbc, Extension of the 12' Steel Culvert Under Pueblo Blvd, Acel/decel Lanes Along Pueblo Blvd, Construction of New Trailhead Facilities, Necessary Earthwork, and Extension of Water and Sewer Services for the New Pueblo County Detention Center. The County Reserves the Right to Waive Informalities or Irregularities and to Reject Any and All Proposals.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents