Similar Projects
Peggy Qualls Animal Sanctuary
New Construction
Conception
Fort Walton Beach, FL

Barkley's
New Construction - 17,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Vero Beach, FL 32962

Brevard Zoo Aquarium at Port Canaveral
New Construction - 130,000 SF
Design
$70,000,000 est. value
Cape Canaveral, FL 32920

Suncoast Humane Society
New Construction - 25,203 SF
Design
$9,000,000 est. value
Englewood, FL

James Montgomery Animal Wellness Center
New Construction - 5,000 SF
Sub-Bidding
$500,000 est. value
Lake City, FL 32055

MIA - Building 716 Restroom Upgrade and Renovations
Post-Bid
FL

Ada Bathroom Renovation Services
Renovation
Post-Bid
Hollywood, FL 33024

Kester Park Concession Renovation and New Restroom Building Construction
Renovation
Results
Less than $450,000 est. value
Pompano Beach, FL

OPAA Gano Park Restroom Improvements
Renovation
Results
$25,000 to $45,000 est. value
Orange Park, FL

Clearwater Marine Aquarium Expansion
New Construction - 93,000 SF
Construction
$66,000,000 est. value
Clearwater, FL 33767

Exotic Animal Hospital
New Construction - 4,500 SF
Construction
$800,000 est. value
Orlando, FL 32806

Elephant Habitat
New Construction
Pending Verification
Yulee, FL

Peter’s Friends Animal Rescue Center
New Construction - 10,000 SF
Conception
$2,600,000 est. value
Saint Augustine, FL

Mote Marine Laboratory and Aquarium
New Construction - 110,000 SF
Design
$130,000,000 est. value
Sarasota, FL 34240

Pygmy Hippo Enclosure
Post-Bid
Less than $208,000 est. value
Miami, FL 33177

Last Updated 12/03/2019 12:08 PM
Project Title

Escambia County ADA Modifications Task 2A

Physical Address View project details and contacts
City, State (County) Molino, FL 32577   (Escambia County)
Category(s) Animal/Plant/Fish Facility, Entertainment/Recreation
Sub-Category(s) Animal/Plant/Fish Facility, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $157,100
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project is defined by the contract documents and consists of American’s with Disabilities Act (ADA) modifications at various locations, with work to include selective demolition, finishes, door hardware, toilet partitions, painting, plumbing, and site work. Phase 1 – Animal Shelter at 20 West Fairfield Drive, Pensacola, FL 32501 The work at the Animal Shelter includes but is not limited to the installation of accessible electric water coolers on the exterior of the building. This work will require cutting and patching of concrete slabs, cutting and patching of concrete masonry unit wall, provide new waste- and water-supply lines, and providing electricity. Civil-sitework includes, but is not limited to, concrete sidewalks, concrete paving, and parking lot signage. Phase 2 – Includes: Harvey C. Bradberry Park, 4760 County Road 99A, McDavid, FL 32568 The work at Harvey C. Bradberry Park includes but is not limited to the minor interior renovation at the men’s and women’s toilet rooms. This work will require the demolition of existing toilet partitions and toilet accessories, providing new solid plastic toilet partitions and toilet accessories, and relocation of toilet fixtures. Civil-site work includes but is not limited to replacing existing sidewalks and concrete paving with new concrete sidewalks and paving. New parking lot signage is part of the Scope of Work. Molino Park, 2340 Crabtree Church Road, Molino, FL 32577 The work at Molino Park is located in building three and includes but is not limited to minor interior renovation at the men’s and women’s toilet rooms. This work will require the demolition of existing toilet partitions and toilet accessories, providing new solid plastic toilet partitions and toilet accessories, and relocation of toilet fixtures. Civil-site work includes replacing existing sidewalks and concrete paving with new concrete sidewalks and paving. The work also includes the installation of new pads under existing bleachers. New parking lot signage is part of the Scope of Work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents