Similar Projects
Roadway Resurfacing Milepost 0 to 122
Bidding

Road Improvements - Harlan School Road West
Post-Bid
Branchburg, NJ 08876

Improvements to Barber Boulevard and Von Steuben Lane
Post-Bid
South Bound Brook, NJ 08880

Ludlow Avenue Road Improvements
Results
Far Hills, NJ 07931

2019 Capital Road Improvement Program Base Bid - Various Roads
Results
$764,310 est. value
North Plainfield, NJ 07060

C1LB--Widen Circle 1 Drive at Bldg. 9 (VA-20-00029812)
Post-Bid
$100,000 to $250,000 est. value
Lyons, NJ 07939

2018 Various Streets Paving
Results

Repaving at Hillsborough Public Schools
Post-Bid
Hillsborough, NJ 08844

Rubberized Asphalt Chip Seal
Results
Branchburg, NJ 08876

Overlay and Milling of Various Township Roads
Post-Bid
Warren, NJ 07059

2019 Road Improvements Project
Results
Belle Mead, NJ 08502

2020 Capital Road Improvement Program Various Roads
Post-Bid
North Plainfield, NJ 07060

FY 2018 NJDOT Municipal Aid Program Clinton Avenue Improvements - Green Brook Road to the Green Brook Bridge
Results
$351,878 est. value
North Plainfield, NJ 07060

Runway 30 Safety Area Improvements Road Relocation
Post-Bid
Bedminster, NJ

Resurfacing of Highland Avenue
Results
$199,782 est. value
Peapack, NJ

Reported 06/19/2020 12:00 AM
Project Title

Improvements to Woodmere Street and Weiss Terrace

Physical Address View project details and contacts
City, State (County) Raritan, NJ 08869   (Somerset County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves improvements to Woodmere Street (2,280 LF, Old York Road to the JFK Primary School) and Weiss Terrace (2,200 LF, Old York Road to Johnson Drive). The work includes approximately 17,200 SY milling & 2,040 Tons 9.5M64 Surface Course. Base repair will be determined by the Borough Engineer after milling operations. Concrete work consists of 765 LF of curb and 1,073 SY of sidewalk and aprons installed in conformance with ADA Standards. Utility work includes storm & sanitary sewer repairs as identified on the construction plans provided.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents