Similar Projects
Library Park Renovation Project Phase 1
Post-Bid
Waterbury, CT

Daniel Hand High School - Two Track Shelters - The Pole-Vault and High Jump Shelter
Post-Bid
Madison, CT 06443

Scantlebury Park Pickleball Courts
Results
New Haven, CT

Waterbury Naugatuck River Greenway - Phase I
Results
Waterbury, CT 06702

Savin Rock Community School Play Area
Post-Bid
West Haven, CT 06516

Goffe Street Park Improvement
Results
New Haven, CT

Baseball and Softball Field Maintenance
Term Contract
Post-Bid
New Haven, CT 06515

Tennis Court Replacement at Doolittle Park
Results
Wallingford, CT 06492

Park Pavilion/Bathroom Facility at Salt Meadow Park
New Construction
Post-Bid
Madison, CT 06443

Synthetic Turf Field and Track Replacement at Guilford High School
Results
Guilford, CT 06437

Foote Memorial Park (8) Har-Tru Clay Tennis Courts Annual Spring Recondition
Post-Bid
Branford, CT 06405

WDC Construction Of 909 Bank Street Park
New Construction
Results
Waterbury, CT 06702

Waterbury Naugatuck River Greenway Phase 1
New Construction
Results
Waterbury, CT

Tennis Court Replacement - High Plains Community Center
Results
$100,000 to $200,000 est. value
Orange, CT 06477

Fairmont Park Field Renovations
Results
New Haven, CT

Last Updated 09/10/2021 12:51 PM
Project Title

Pickleball Courts at Bittner Park

Physical Address View project details and contacts
City, State (County) Guilford, CT 06437   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Specifically includes: 1. Grubbing of tree stumps and vegetation roots. 2. Removal of chain link fencing and bituminous concrete pavement. 3. Placement of earth fill to achieve the playing court post-tensioned concrete slab subgrade elevation. 4. Fencing line, terminal, corner and gate post and foundation construction. 5. Playing court post-tensioned concrete slab construction. 6. Playing court post-tensioned concrete slab surfacing system installation. 7. Chain link fencing and gate construction. 8. Topsoil placement, finished grading, and turf establishment.

Details

Park/Playground, New Construction.
Division 02 - Existing Conditions, Site Remediation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 11 - Equipment, Athletic and Recreational Equipment.
Division 31 - Earthwork, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Athletic Surfacing, Fences and Gates, Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents