Similar Projects
Veazy Park Apartments
New Construction, Demolition - 58,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Boise, ID 83706

Amity Road and Maple Grove Road Roundabout - Ada County Highway District
Infrastructure
Conception
$652,000 CJ est. value
Boise, ID 83709

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Capitol Student Housing
New Construction, Demolition - 158,046 SF
Design
$10,000,000 CJ est. value
Boise, ID 83706

Albeni Falls Dam Spillway Gate Recoating and HSS Weld Repair
Infrastructure
Bidding
$25,000,000 CJ est. value
Laclede, ID 83841

Pocatello Transmission Line Replacement for 5MG Tank
Infrastructure
Bidding
$710,000 CJ est. value
Pocatello, ID 83204

Element Hotel by Marriott / Driggs
New Construction, Infrastructure - 67,657 SF
Sub-Bidding
$20,000,000 CJ est. value
Driggs, ID 83422

FY23 D3 Interstate Striping
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Boise, ID 83716

Lakeview Cabin Foundation Replacement Heyburn State Park
Infrastructure
Post-Bid
$60,000 CJ est. value
Elk River, ID 83827

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Solid Waste Farm Landfill Operations Building
New Construction
Results
Coeur d'Alene, ID

Southridge South Residentail Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Meridian, ID 83642

Springtree Lane Multi Residential
New Construction, Infrastructure - 44,823 SF
Pending Verification
$5,240,000 CJ est. value
Boise, ID 83709

Wildwood Street Bridge #1425, 0.1 miles N/O Fairview Avenue - Ada County Highway District
New Construction, Infrastructure
Conception
$434,000 CJ est. value
Boise, ID 83713

Reported 08/11/2022 12:00 AM
Project Title

Solid Waste Facilities Improvements Project

Physical Address View project details and contacts
City, State (County) Sandpoint, ID 83864   (Bonner County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $710,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 05th, 2022, project bid date was moved from August 1st to August 10th. The project generally consists of site improvements at four (4) existing solid waste collection sites. The project also includes construction of three (3) new buildings at the Colburn site and one (1) new building at the Idaho Hill site To get on the Plan Holders List and request the link and password. Prospective Bidders must be put on the Plan Holders List to Bid and be notified of changes or addendum(s). Interested contractors are encouraged to attend. Each bid must be accompanied by a Certified Check, Cashiers Check, or Bid Bond payable to Bonner County Board of Commissioners in an amount not less than ten percent (10%) of the total amount of the bid. Successful Bidders shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful Bidder(s) and a certificate(s) of that insurance shall be provided. This project is funded in part or in whole with loan funding from USDA Rural Development. Davis-Bacon Wage Rates will not be applicable to this project. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid that is in the best interest of the Owner. Oral questions will only be accepted at the Pre-Bid conference. Written comments may be submitted to Travis Pyle, PE of Great West Engineering, email at: tpyle@greatwesteng.com

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents