Similar Projects
The Oak Development Master Plan
New Construction - 250,000 SF
Conception
Oklahoma City, OK 73112

Spring Creek Elementary School Classroom Addition
Renovation, Addition
Conception
$5,520,000 est. value
Edmond, OK 73013

New K-4th Grade Elementary School
New Construction
Design
$35,460,000 est. value
OK

Convergence
New Construction, Infrastructure - 200,000 SF
Design
$240,000,000 CJ est. value
Oklahoma City, OK 73102

FTTC Rockwell Campus Administration Building Switchgear Replacement
Renovation
Bidding
$150,000 CJ est. value
Oklahoma City, OK 73142

QuikTrip #7010 / Oklahoma City
New Construction, Infrastructure
Bidding
$5,500,000 CJ est. value
Oklahoma City, OK 73131

Multi-Tenant Kitchen
Renovation - 7,870 SF
Post-Bid
Oklahoma City, OK 73118

Chick-Fil-A #4935
New Construction, Renovation - 4,053 SF
Post-Bid
$1,000,000 to $2,000,000 est. value
Oklahoma City, OK 73118

Gymnasium at Wilson Elementary School
New Construction
Results
$3,500,000 est. value
Oklahoma City, OK 73103

Chisholm Elementary 2022 Restroom Renovations
Renovation
Results
Edmond, OK 73049

Arby's
Renovation
Construction
Oklahoma City, OK

Arby's
Renovation
Construction
Edmond, OK

Dutch Brothers Coffee
New Construction - 950 SF
Pending Verification
Edmond, OK 73034

Dunkin Donuts
New Construction
Pending Verification
Oklahoma City, OK 73107

Cafeteria & Kitchen Expansion
Renovation, Addition
Conception
$7,705,000 est. value
Edmond, OK 73025

Last Updated 03/21/2023 03:17 PM
Project Title

Deer Creek Prairie Vale Elementary School Kitchen and Cafeteria Expansion 2023

Physical Address View project details and contacts
City, State (County) Edmond, OK 73034   (Oklahoma County)
Category(s) Commercial, Education
Sub-Category(s) Elementary School, Food/Beverage Service
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work Included: A. The General Conditions, Supplementary Conditions, and Division 1 are hereby made a part of each of the technical sections that follow and shall be understood to apply and shall apply in full to all individuals or corporations who contract or subcontract to perform any part or all of the project work. B. Indications on the Drawings or in any section of the Specifications of an article or material, operation, or method, requires that the Contractor shall provide each item or service, or quality, or is subject to qualifications noted and the Contractor shall perform each operation prescribed according to the conditions stated providing, therefore, all necessary labor, equipment and incidentals to complete the project work. C. The following is the SCOPE OF WORK to be performed by each Contractor for each Bid Package. All Contractors shall coordinate with each trade the exact location of existing equipment, piping, etc., before any work begins. This summary of work in no way limits the Contractor's responsibility to provide fully operational facilities as shown on the Drawings and specified herein.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents