Similar Projects
Combined Maintenance Facility - C114 - City of Aurora
New Construction, Infrastructure
Conception
$31,506,000 CJ est. value
Aurora, IL 60506

Aurora Central Catholic High School STEM Building
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Aurora, IL 60506

Raymond Street Culvert Rehabilitation
Infrastructure
Design
$244,000 CJ est. value
South Elgin, IL 60177

Bridge Repairs
Infrastructure
Bidding
$600,000 CJ est. value
Campton Hills, IL 60124

Village of West Dundee Downtown Restoration
Infrastructure
Bidding
$400,000 CJ est. value
West Dundee, IL 60118

PIP-II Site Work
Post-Bid
Batavia, IL

Cemetery Services
Term Contract, Alteration
Post-Bid
Geneva, IL 60134

Solar Photovoltaic Systems Site Development and Operation
Infrastructure
Results
Saint Charles, IL

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome
New Construction, Infrastructure - 200,000 SF
Pending Verification
$9,201,734 CJ est. value
Aurora, IL 60506

Charlestowne Lakes (Oliver Hoffman Property) Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
St Charles, IL 60174

Lexington Club
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
St Charles, IL 60174

Construction of Elburn Station Park Storm Sewer Outfall, Water Service and Path Extension Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Elburn, IL 60119

EASD Site Improvements 2022
Infrastructure
Post-Bid
Aurora, IL 60505

Baker Community Center Site Improvements
Infrastructure
Results
Saint Charles, IL 60174

Last Updated 10/12/2022 12:07 AM
Project Title

Bluff City Boulevard Phase III Combined Sewer Separation Project

Physical Address View project details and contacts
City, State (County) Elgin, IL 60123   (Kane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $5,932,828 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project in general (approximately 6,510 linear feet in length) includes but is not limited to furnishing all labor, materials, equipment and other as included items necessary for the completion of following base bid quantities: approximately 4,413' of 12" to 42" storm sewers; approximately 95' of 8" and 23' of 12" sanitary sewers; approximately 1,774' of 6"-8" water mains; approximately 4,398' of 8" to 24" sanitary sewer lining; approximately 5,304 SY of pavement patching and pavement removal; approximately 11,668 SY pavement surface milling; approximately 2,435' of curb and gutter removal and replacement; approximately 8,772 sq. ft. of sidewalk removal and replacement; removal and/or abandonment of existing water and sewer mains; water and sewer main adjustments; and water and sanitary service-re-establishment; parkway restoration and other miscellaneous items of work in accordance with the Contract Plans and Specifications. An original bid bond (in the amount of 5% of the original bid amount) must be delivered to the City of Elgin Purchasing Department, 150 Dexter Court no later than 12:00 pm on bid due. All proposals must be accompanied by a bid bond, certified or cashier's or a bank draft in an amount equal to at least five percent (5%) of the bid, payable without condition to the City of Elgin, Illinois, which sum shall be forfeited in case the successful bidder fails to enter into a binding contract and provide a properly executed contract surety bond within 15 days after the contract is awarded by the City Council. The successful bidder shall be required to furnish a Performance and Payment Bond equal to one hundred percent (100%) of the total contract price as security for the faithful performance and the payment of all bills and obligations arising from the performance of the contract. The successful bidder and all Subcontractors shall be required to conform to the labor standards set forth in the Contract Documents. The successful bidder shall pay prevailing wage and shall provide certified payrolls to the City for the duration of the Project. The successful bidder shall submit a list of qualified references for projects similar size and scope of the project.Proposal withdrawn may not be resubmitted at the same letting.Each bidder shall satisfy the City as to their ability, financially or otherwise, to carry out the work. Questions regarding the bidding process, bonds, or bidding software can be directed to Daina DeNye, Purchasing Officer at (847) 931-5604 or denye_d@cityofelgin.org. Questions regarding this bid package can be directed to Eric Weiss, Water Director by email at weiss_e@cityofelgin.org. Technical questions regarding the scope of work should be addressed to David Schultz at HR Green, Inc. at dschultz@hrgreen.com or by calling (630) 708-5002 The right is reserved to reject any or all bids or to waive technicalities and any informality in any bid.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents