Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Bidding
$828,757 est. value
Ontario, CA 91761

Cold plane AC, place HMA (TYPE A) and RHMA-G
Infrastructure
Bidding
$8,600,000 est. value
CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Cip Bridges, Construct Roadway, Retaining Walls and Modify Electrical
New Construction, Infrastructure
Bidding
$98,000,000 est. value
CA

Paving Repairs and Ramps at FHFB
Term Contract
Post-Bid
Richmond, CA

Richmond Residential Streets Pavement Renovation and Sewer Replacement
Infrastructure
Results
$7,300,000 est. value
San Francisco, CA

Ac Overlay Phase Two
Infrastructure
Bidding
$6,800,000 est. value
Sacramento, CA

Golden Gate Avenue and Laguna Street Pavement Renovation and Sewer Replacement
Infrastructure
Post-Bid
$9,000,000 est. value
San Francisco, CA 94158

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

Last Updated 12/15/2021 03:45 AM
Project Title

Cold Plane Asphalt Concrete Pavement and Place HMA

Physical Address View project details and contacts
City, State (County) CA   (Lassen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,380,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In Lassen County Near Janesville From 0.1 Mile North Of Sunnyside Road To 0.1 Mile North Of Route 36 DVBE Goal - 3% Item No. Item Code Item Description Unit Of Measure Estimated Quantity 1 070030 Lead Compliance Plan Ls Lump Sum 2 090100 Time-Related Overhead (Wday) Wday 25 3 120090 Construction Area Signs Ls Lump Sum 4 120100 Traffic Control System Ls Lump Sum 5 120152 Temporary Pavement Marking (Tape) Sqft 420 6 012671 Portable Radar Speed Feedback Sign System (Ls) Ls Lump Sum 7 012672 Stationary Impact Attenuator Vehicle (Ls) Ls Lump Sum 8 128652 Portable Changeable Message Sign (Ls) Ls Lump Sum 9 129161 Automated Flagger Assistance Device Day Ea 50 10 130100 Job Site Management Ls Lump Sum 11 130200 Prepare Water Pollution Control Program Ls Lump Sum 12 190185 Shoulder Backing Ton 70 13 374002 Asphaltic Emulsion (Fog Seal Coat) Ton 16 14 390132 Hot Mix Asphalt (Type a) Ton 6,440 15 397005 Tack Coat Ton 28 16 398200 Cold Plane Asphalt Concrete Pavement Sqyd 93,500 17 810250 Pavement Marker (Retroreflective-Recessed) Ea 1,830 18 840515 Thermoplastic Pavement Marking Sqft 2,130 19 840560 Thermoplastic Traffic Stripe (Sprayable) Lf 84,600 20 846051 12" Rumble Strip (Asphalt Concrete Pavement) Sta 240 21 870009 Maintaining Existing Traffic Management System Elements During Construction Ls Lump Sum 22 872133 Modifying Signal And Lighting Systems Ls Lump Sum

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents