Similar Projects
Aviation Heritage Park Museum
New Construction - 11,000 SF
Design
$2,500,000 est. value
Bowling Green, KY 42104

Waterfront Botanical Gardens Conservatory
New Construction
Pending Verification
Louisville, KY 40206

Corvette Museum Plans Expansion
Addition - 30,000 SF
Design
$12,000,000 est. value
Bowling Green, KY 42101

Louisville Water Tower Restoration and Museum Renovation
Renovation, Infrastructure
Bidding
$1,000,001 to $3,000,000 est. value
Louisville, KY 40207

Depot Museum Interior
Renovation, Alteration
Post-Bid
Erlanger, KY 41018

Depot Museum Interior
Renovation, Alteration
Post-Bid
Erlanger, KY 41018

Last Updated 03/29/2022 06:11 PM
Project Title

Wrather West KY Museum Improvements

Physical Address View project details and contacts
City, State (County) Murray, KY   (Calloway County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New finishes in the Auditorium, refurbished seating, replacement stage and window curtains. New finishes include new carpet, hardwood flooring and paint on walls and ceiling. New mechanical and electrical systems are to replace outdated systems. Alternate 1 – Balcony: Remove old carpet/install new carpet Alternate 2 – Auditorium Exit Doors – New Doors, Frames and Hardware Alternate 3 – Install extension/new controls for Automatic Logic Control System. Alternate 4 – New Controls (ABC); Remove Old/Install new Alternate 5 – Auditorium: New Ceiling/Stage Lighting & Sound System

Details

Museum, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents