Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

I Street Bridge Replacement / Sacramento
New Construction, Infrastructure
Design
$210,000,000 est. value
West Sacramento, CA 95605

Construct Curb Ramps, Sidewalks and Modify Signal Systems
Infrastructure
Bidding
$2,520,000 CJ est. value
Sacramento, CA 95829

Construct Curb Ramps, Sidewalks and Modify Signal Systems
Infrastructure
Bidding
$2,520,000 CJ est. value
Sacramento, CA 95829

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Excavation Services
Infrastructure
Post-Bid
$80,000 est. value
CA

HMA Concrete Grinder Dig out Repair and Replacement Paving
Infrastructure
Results
CA

Place polyester concrete overlay
Infrastructure
Results
$2,050,000 est. value

University Research Park Mixed Use Development
New Construction, Infrastructure - 165,343 SF
Pending Verification
$40,000,000 CJ est. value
Davis, CA 95618

West Sacramento Flood Control Improvements
Infrastructure
Pending Verification
$175,000,000 CJ est. value
West Sacramento, CA 95691

RFP Engineering - Architectural Design Services Soccer Fields
Infrastructure
Bidding
$1,200,000 CJ est. value
Woodland, CA 95776

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Replace Culverts and Install Cured in-Place Pipeliners
Infrastructure
Results
$540,000 est. value
CA

Overlay Project 2022
Infrastructure
Bidding
$1,300,000 CJ est. value
Winters, CA 95694

2022 Chip Seal Project
Infrastructure
Post-Bid
Woodland, CA

Last Updated 08/04/2022 05:08 PM
Project Title

North Riverwalk Trail Expansion Project

Physical Address View project details and contacts
City, State (County) West Sacramento, CA 95691   (Yolo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct an important missing segment of the Riverwalk Trail from the existing Riverwalk under the I Street Bridge northward along the levee to the Broderick Boat Ramp. The project will create a continuous pedestrian/bicycle trail along the riverfront area and will also include an extension of the pedestrian access path to the west, along D Street and 2nd Street, into the heart of the Washington District at 3rd Street. The Project also includes streetscape improvements on the west side of 3rd Street between C and D Street and on C Street between 3rd and 4th Streets, and a mid-block crossing on 3rd Street between D Street and E Street. The streetscape improvements include wide sidewalks, street trees, public art, and high-visibility crossings for improved pedestrian safety.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents