Similar Projects
MO 370 Interchange Ramp at Salt River Road, Phase 1
Infrastructure
Bidding
$50,000 est. value
Saint Peters, MO 63376

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Implementing Traffic Control Signaling Devices and Roadway Improvements
Infrastructure, Alteration
Post-Bid
Wentzville, MO

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

2021 Partial Depth Repairs
Infrastructure
Results
Saint Peters, MO

Swale and Culvert Work
Alteration
Post-Bid
Saint Peters, MO 63376

Sidewalk and Drainage Improvements
Infrastructure
Results
Saint Charles, MO

Plastic Pipe Liner, HDPE Pipe, and Polypropylene
Infrastructure
Post-Bid
Saint Charles, MO

Main Street Improvements (Oak Street to Saint Charles Street)
Infrastructure
Results
Cottleville, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Mexico Road Resurfacing and Pedestrian Bridge Phase 3
New Construction, Infrastructure
Results
O Fallon, MO

Last Updated 06/28/2022 01:47 AM
Project Title

Central School Road and St. Peters- Howell Road Traffic Flow Improvements

Physical Address View project details and contacts
City, State (County) Saint Peters, MO 63376   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work Includes the Furnishing of Materials, Tools, Equipment and Labor Necessary to Construct Central School Road and St. Peters-howell Road Traffic Flow Improvements, Cmaq-7302(683) in St. Charles County, Missouri. The Construction Shall Include All Work Incidental to the Furnishing of Materials, Tools, Equipment and Labor Necessary to Construct the Proposed Grading, Paving, Drainage, Retaining Wall, Traffic Signal, and Other Appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents