Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Asphalt Patching Services
Infrastructure
Post-Bid
$500,000 est. value
South Lake Tahoe, CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Roadway Excavation and Install Concrete Drainage Inlet
Infrastructure
Results
$850,000 est. value
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Motherlode Forcemain Replacement Program - El Dorado Irrigation District
Renovation, Infrastructure
Construction
$15,000,000 CJ est. value
Placerville, CA 95667

The Landing at Tahoe Resort and Spa Cabins Addition
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
South Lake Tahoe, CA 96150

Mackinaw Hotel
New Construction, Infrastructure - 6,000 SF
Pending Verification
$26,000,000 CJ est. value
Placerville, CA 95667

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 CJ est. value
Kyburz, CA 95720

SpringHill Suites / Placerville
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Placerville, CA 95667

As-Needed Road Surface Treatment Services
Infrastructure
Post-Bid
CA

2022 Road Work Project
Infrastructure
Results
$250,000 est. value
CA

Last Updated 07/10/2023 10:08 AM
Project Title

Guardrail Upgrades Multiple Locations - West Slope - 36105075 - El Dorado County

Physical Address View project details and contacts
City, State (County) Placerville, CA 95667   (El Dorado County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $573,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of out-of-compliance guardrail with new guardrail that meets current standards in various areas of Pollock Pines. 1. Sly Pa rk Road PM 9.86 (670 LF) 2. Sly Pa rk Road PM 9.35 (473 LF) 3. Mormon Emigrant Trail at Second Dam (826 LF) 4. Mormon Emigrant Trail at Second Dam (825 LF) 5. Mormon Emigrant Trail at First Dam (648 8 & 9. Sly Pa rk Road PM 6.56 (88' & 113') LF) 10. Newtown Road PM 2.83 (180') 6. Mormon Emigrant Trail at First Dam 11. Newtown Road at Snows Road (241') (647LF) 12. Pleasant Valley Road PM 1.14 (51 ') 7. Sly Park Road at Mormon Emigrant Trail (296') Project is included in the El Dorado County’s FY 2022-2042 Budget CIP. As of August 8, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated in FY 2023/2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents