Similar Projects
Harlem Road Improvements
Infrastructure
Bidding
$178,000 est. value
Machesney Park, IL 61115

2022 Streets Program Improvements
Infrastructure
Bidding
$1,019,000 est. value
Rockford, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

North Street Maintenance 2021
Results
Less than $148,709 est. value
Cherry Valley, IL 61016

City-Wide Street Repairs Group No. 4 - 2022 (Concrete)
Infrastructure
Bidding
$400,000 est. value
Rockford, IL

Hot-Mix Asphalt Patching FY 2022
Term Contract
Post-Bid
Less than $400,000 est. value
Rockford, IL

Pecatonica Middle School Pavement
Results
Pecatonica, IL 61063

2022 City - Wide Street Repairs Group No. 3
Infrastructure
Bidding
$400,000 est. value
Rockford, IL

2021 Overlay
Alteration
Post-Bid
Loves Park, IL

Sealcoating, Patching, Crack Filling and Striping
Results
Rockton, IL 61072

Construction HMA Resurfacing W/HMA Sc, Mix D
Infrastructure
Bidding
$500,000 est. value
New Milford, IL

Township of Roscoe 2021 Paving
Infrastructure
Post-Bid
Rockford, IL

Christina Street Reconstruction Phase 2
Results
Less than $669,506 est. value
Rockford, IL 61104

Last Updated 05/05/2022 02:58 AM
Project Title

2022 Motor Fuel Tax General Maintenance Project

Physical Address View project details and contacts
City, State (County) Roscoe, IL   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rockton Road improvements consist of the construction of approximately 820' of guardrail and the associated traffic barrier terminals, 1,560 tons of HMA pavement, 301 square yards of HMA surface removal - butt joints, epoxy paint pavement marking lines, and traffic control and protection. Middle Road improvements consist of the removal of 325' of guardrail and replacement with approximately 425' of guardrail and the associated traffic barrier terminals, channel excavation to removed collect sediment upstream and downstream of the box culvert, and traffic control and protection.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents