Similar Projects
Mulberry Knoll Sewer Collection System
Infrastructure
Bidding
Millsboro, DE

Domestic Water and Sanitary Sewer Piping Replacement Phase 1
Infrastructure
Bidding
Smyrna, DE 19977

STAR Campus Utility and Roadway Project
Post-Bid
Newark, DE 19716

Chemical Cleaning of Cell 3 Leachate Collection and Force Main System
Infrastructure
Post-Bid
Georgetown, DE 19947

Magnolia Yard Sewer Improvements
Results
DE

NorthWest-NorthEast Front Street Sanitary Sewer Rehabilitation Project
Results
Milford, DE 19963

East Commerce Street Water and Sewer Upgrades Phase 1
Infrastructure
Post-Bid
Smyrna, DE 19977

Sewer Cleaning and Inspection Phase 8
Results
Less than $633,346 est. value
Wilmington, DE

Sewer Upgrade
Infrastructure
Post-Bid
New Castle, DE 19720

Construction of the Herring Creek Sanitary Sewer District North Gravity Sewer and Force Main
Results
Georgetown, DE 19947

2018 Countywide Sanitary Sewer Repair Project
Results
New Castle, DE 19720

Lantana Sewer Realignment Design Phase 1
Results
New Castle, DE 19720

Sanitary Sewer Repair and Rehabilitation
Results
Newark, DE

Septic Elimination
Results
Magnolia, DE

Sewer Main Extension
Results
Millsboro, DE 19966

Last Updated 11/09/2021 04:35 PM
Project Title

Southeast Sewer Expansion Project Phases 1 and 2

Physical Address View project details and contacts
City, State (County) Selbyville, DE   (Sussex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the upgrade of two (2) wastewater pump stations and appurtenances including pumps, electrical, controls, flow meters, emergency generator, site work, approximately 6,330 LF of 10-inch forcemain installed by open cut methods, approximately 1,020 LF of 12-inch forcemain installed by horizontal directional drill method, and approximately 300 LF of 18-inch casing pipe with 12-inch carrier installed via horizontally directional drill method, and five (5) air release manholes, five (5) plug valves, clean and televise approximately 300 LF of 12” forcemain, and associated maintenance of traffic and other miscellaneous related work as indicated within the contract documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents