Similar Projects
Sakura Asian Village
New Construction - 90,000 SF
Conception
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Fowler Building
Renovation - 51,675 SF
Conception
Detroit, MI 48226

Consumers Energy New Office Building
New Construction - 40,000 SF
Design
$20,000,000 est. value
Grand Rapids, MI 49504

Acrisure - New Headquarters
New Construction - 105,000 SF
Design
Grand Rapids, MI 49503

Office Improvements
Renovation
Bidding
Marquette, MI 49855

Marquette Alger Regional Education Service Agency Office Improvements
Bidding
Marquette, MI

Office Renovation at 12251 James Street
Renovation
Post-Bid
Holland, MI

Bseed Phase 2 Office Renovation
Renovation
Post-Bid
Detroit, MI 48226

Marie Tribe of Chippewa Indians, Health Center – Office and Bathroom Upgrades
Results
Sault Sainte Marie, MI

Office Renovation Suite 828
Renovation, Term Contract
Results
Detroit, MI

Park District Project
New Construction - 87,152 SF
Construction
$154,000,000 est. value
East Lansing, MI 48823

Live Well Homes
Renovation, Addition - 21,000 SF
Construction
$900,000 est. value
Royal Oak, MI 48067

Telegraph Road Office
New Construction - 10,308 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Bloomfield, MI

Women's City Club Redevelopment
Renovation - 57,000 SF
Pending Verification
$25,000,000 est. value
Detroit, MI 48201

Marquette Building
Renovation - 10,000 SF
Conception
Detroit, MI 48226

Reported 05/02/2020 12:00 AM
Project Title

New Soo Lock Resident Office

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI   (Chippewa County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the New Soo Lock Resident Office located in Sault Sainte Marie, Michigan: - Relocate the existing fence line of the Soo Locks facility to create more space within the desired project area. (See attachment labeled Preliminary Site Plan). - Clear and grade office site area including tree removal and a small amount of concrete sidewalk demolition. - Installation of utilities (water, sewer, electric, data/communications). This work will require trenching. - Supply and install a modular office to house twenty-four (24) Corps of Engineers field supervision staff and project engineers. The office must remain on-site and ownership must be turned over to the government as a contractor furnished material. The modular office must include: four (4) offices with windows in the doors for opposite sex supervisory requirements, male restrooms with 2 restroom stalls, two (2) urinals, and two (2) washbasins, female restrooms with two to three (2-3) stalls, two (2) washbasins, a conference meeting room capable of seating thirty (30) people, kitchenette including two (2) refrigerators, two (2) microwaves, cabinets, and tables and chairs for twelve (12) people, large mudroom off an entry to accommodate large lockers for twenty (20) people, large supply room for office inventory, personal protective equipment (PPE) storage for visitors, and secured and unsecured storage areas for records, and twenty (20) L-shaped cubicles for the remainder of employees. The modular office must be suitable in size (4,000 square feet minimum) for twenty-four (24) full-time employees to comfortably work. The office shall be fully furnished including all workstations, chairs, storage, appliances, etc. The modular office shall be securely anchored to the ground to guard against movement during high winds. - Tie-in the utilities to the office, place new sidewalk/concrete flat work to connect the office to existing pathways, and restoration site work/seeding.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents