Similar Projects
Oxford Drive Water Main and Drainage Improvements
Bidding
Bradenton, FL 34205

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

FY19 Seawall Restoration at Marina Drive - 56th Street
Post-Bid
$160,000 est. value
Holmes Beach, FL

North River Ranch Phases 1B and 1D East
Results
Sarasota, FL 34230

Misc Concrete and Drainage Repairs
Results
Less than $240,271 est. value

FY19 Seawall Restoration at Marina Drive - 67th Street
Post-Bid
$160,000 est. value
Holmes Beach, FL

Clean and Reshape Ditches
Results
Less than $196,561 est. value

Lake Bank Repairs
Post-Bid
FL

Lido Key Hurricane and Storm Damage Reduction Project
Results
$10,000,000 to $25,000,000 est. value
Sarasota, FL

Manatee High School Safety Improvements (North)
Post-Bid
Bradenton, FL 34201

Oak Street Drainage Improvements Braden River Watershed Oak Street from Hubbel Road to Pin Street
Results
$375,000 to $382,000 est. value
Bradenton, FL 34206

Presidio and Riviera Drainage Improvements
Post-Bid
Lakewood Ranch, FL 34202

Miscellaneous Concrete and Drainage
Results
Less than $240,271 est. value

Presidio and Riviera Drainage Improvements, CDD5
Post-Bid
Lakewood Ranch, FL

Revetment Block Installation (MBC)
Results
Less than $75,000 est. value
FL

Last Updated 01/19/2021 10:25 AM
Project Title

Shore Protection Project, Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida

Physical Address View project details and contacts
City, State (County) Anna Maria, FL   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project work consists of Work consists of beach fill between R-12 to R-41+305. The primary sand source will be located in Passage Key Inlet ebb shoal. The fill template design includes a berm crest elevation of +4.0 feet North American Vertical Datum 1988 (NAVD88). The seaward face of the berm has a slope of 1v:14h from R-12 to R-33 and a slope of 1v:15h for R-33 to R-41+305. The cut depths at the borrow areas vary from 14 feet to 27 feet with a two-foot disturbance depth. Project work also includes, but is not limited to, beach tilling, construction/vibration control and monitoring, turbidity monitoring, pipeline corridor mapping, endangered species monitoring, sea turtle trawl-sweeping (hopper dredges only), beach fill remediation, and incidental related work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents