Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

2022 Lake Whatcom Boulevard Sewer CIPP Project
Infrastructure
Bidding
$90,000 to $100,000 est. value
Bellingham, WA 98229

Rehabilitate Wastewater System
Alteration
Bidding
Port Angeles, WA 98363

Value Planning Analysis Services - The City of Palouse
Term Contract, Alteration
Post-Bid
Palouse, WA

Allen Road Sanitary Sewer Improvements
Infrastructure
Post-Bid
$225,000 est. value
Roy, WA 98580

Southside Interceptor CIPP Sewer Rehabilitation Phase 2
Infrastructure
Results
$1,662,108 est. value
Vancouver, WA 98687

Water Meter Changeout
Infrastructure
Results
WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

Bangor Keyport Force Main Replacement
Renovation, Infrastructure
Bidding
$23,200,000 to $24,700,000 est. value
Poulsbo, WA 98370

Highlands and Northwest Interceptor Sewer Rehabilitation
Infrastructure
Post-Bid
$1,206,033 est. value
Kennewick, WA 99336

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

45th Ave NE Sewer Re-Route (2022)
Infrastructure
Bidding
$400,000 est. value
Seattle, WA 98124

Continuous Steel Sewer Rod - Value Blanket
Infrastructure, Alteration
Post-Bid
Spokane, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Last Updated 03/09/2022 10:29 AM
Project Title

2022 Water and Sewer System Improvements

Physical Address View project details and contacts
City, State (County) Mukilteo, WA   (Snohomish County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,818,040
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of four schedules of work. Schedule A consists of the installation of approximately 3,100 linear feet of 8-inch ductile iron water main and 340 linear feet of 12-inch ductile iron water main by open trench, jacking and boring of approximately 110 linear feet of 24-inch steel casing with 12-inch ductile iron carrier pipe under the Mukilteo Speedway and 85 linear feet of 24-inch steel casing with 8-inch ductile iron carrier pipe under a wetland and its buffer in an unimproved proposed easement, and one PRV vault, replacing the existing 6-inch cast iron water main along 3rd Street, 4th Street, 8th Street, Washington Avenue, Church Avenue, and Webster Street, as shown on the Plans, and hereinafter specified. Work will also include water services, hydrants, valves, connections to the existing system, HMA trench patch, driveway reconstruction, and general restoration. Schedule B consists of the installation of approximately 225 linear feet of 8-inch HDPE DR 17 gravity sanitary sewer, 40 linear feet of 4-inch HDPE DR 17 sewer force main, and two 48-inch diameter polymer concrete manholes, replacing the existing 4-inch PVC sewer force main on Harbour Pointe Boulevard. Work will also include connections to the existing system, HMA trench patch, and general restoration. Schedule C and D provide roadway improvements consisting of HMA grind and overlay.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents