Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Ebenezer Rd / Swatara Creek
Demolition, New Construction, Infrastructure
Design
$4,157,918 CJ est. value
Jonestown, PA 17038

Ebenezer Rd / Swatara Creek
Demolition, New Construction, Infrastructure
Design
$4,157,918 CJ est. value
Jonestown, PA 17038

Cornwall & Wilhelm Inters
Infrastructure
Bidding
$2,499,999 CJ est. value
Lebanon, PA 17046

Cornwall & Wilhelm Inters
Infrastructure
Bidding
$2,499,999 CJ est. value
Lebanon, PA 17046

Fort Indiantown Gap - Rehabilitate PA Veteran's Memorial Cemetery
Post-Bid
$2,100,000 to $3,100,000 est. value
Annville, PA 17003

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Access Control Point West Fort Indiantown Gap
Results
Annville, PA 17003

Construct Access Control Points Fort Indiantown Gap
Term Contract
Results
$10,000,000 to $25,000,000 est. value
Annville, PA 17003

Ebenezer Rd / US 22
Infrastructure
Construction
$1,098,438 CJ est. value
Jonestown, PA 17038

Ebenezer Rd / US 22
Infrastructure
Construction
$1,098,438 CJ est. value
Jonestown, PA 17038

Fort Indiantown Gap - Construct New Auditorium
New Construction, Infrastructure
Pending Verification
$8,500,000 CJ est. value
Annville, PA 17003

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

PA 756 - Lamberd Ave to Alvin St
Infrastructure
Design
$4,702,363 CJ est. value
Richland, PA 15904

Last Updated 04/13/2023 12:10 PM
Project Title

2023 Road Work

Physical Address View project details and contacts
City, State (County) Cleona, PA 17042   (Lebanon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $443,501 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 17, 2023, the project has been awarded. A timeline for construction has not been confirmed. For 2023 Road Work The project includes, but is not limited to, pavement resurfacing along East Maple Street and Walnut Street, as well as curb and sidewalk work along East Maple Street. The curb and sidewalk work includes curb ramp replacements and lawn restoration. CLARIFICATION DEADLINE 1/30/2023 10:00 AM Each proposal must be accompanied by a certified check, bank cashier's check, trust company treasurer's check or bid bond (in the required form) for ten percent (10%) of the bid total. Prevailing wage rates and record-keeping procedures established by Pennsylvania Department of Labor & Industry shall apply. Cleona Borough hereby reserves the right, which is understood and agreed to by all bidders, to reject any and all bids and to waive any omissions, errors, mistakes, defects or irregularities in any bid at its sole discretion. A pre-bid meeting is not scheduled for this project. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents