Similar Projects
Reported | 02/20/2020 12:00 AM |
Project Title | OR Surgical Exam Tables |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX (El Paso County) |
Category(s) | Single Trades |
Sub-Category(s) | Furnishings |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall deinstall the Surgical Exam Tables and make all necessary utility disconnections, remove and transport equipment to a predetermined location within same customer facility for pickup or disposal. Customer is responsible for decontamination and release of the equipment as non-hazardous. Equipment disposition from the staging point will be dependent upon Customer selection of disposal option. If removed equipment is to become contractor property, it will be held on-site at the designated location for pickup by the contractor representative within a reasonable time, not to exceed five (5) working days. Once the current Surgical Exam Tables is removed; installation includes all necessary labor (non-union) and materials required to uncrate, set-in-place and assemble equipment. Price is for normal working hours, Monday – Friday 8 am -5 pm unless otherwise noted. Contractor also includes with its Installation Services an operational check-out test, any necessary adjustments and a demonstration of the equipment for appropriate facility personnel. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |