Similar Projects
Wastewater Treatment Plant Improvements
Infrastructure
Bidding
$1,760,000 CJ est. value
Ridgeway, IA 52165

Iowa Highway 44 Trail Extension Project
Infrastructure
Bidding
$569,000 CJ est. value
Grimes, IA 50111

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

Edmundson Park Improvements
Infrastructure
Bidding
$602,800 CJ est. value
Oskaloosa, IA 52577

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

Chemical Building
New Construction, Infrastructure
Results
$1,707,000 CJ est. value
Eagle Grove, IA 50533

Time and Material (NTE), Commercial Plumbing Contracting
Term Contract
Post-Bid
Ames, IA 50010

Skywalk Heat Pump Replacement
Infrastructure
Results
$24,820 CJ est. value
Sioux City, IA 51101

Last Updated 03/30/2023 09:15 AM
Project Title

Missouri River Wildlife Unit Flood Damage Repairs

Physical Address View project details and contacts
City, State (County) Missouri Valley, IA 51555   (Harrison County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,106,860 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Missouri River Wildlife Unit Flood Damage Repairs This project consists of FEMA repairs by removing sediment, fixing parking lots, water control structures, pipes and roadways in various locations in Woodbury, Monona, Harrison and Shelby Counties Each bidder shall accompany the bid with a bid security as defined in Iowa code section 26.8. Scanned copies of the bid security will be accepted for those bidders submitting bids electronically. Additionally, the submission of an electronic bid security in the form of a certified check, cashiers check, or money order, the original security must be mailed to the Department at the Wallace State Office Building, 502 East 9th Street, Des Moines, IA 50319 within (5) business days of the bid letting date. The bid security must be in an amount set forth in the bidding documents and made payable to the Iowa Department of Natural Resources. Failure to execute a contract for the proposed work and file an acceptable Performance Bond, in an amount equal to 100% of the contract price and a certificate of liability insurance, within thirty (30) days of the date of the award of the contract, will be just and sufficient cause for the rescinding of the award and the forfeiture of the bid security. Sealed bids sent via email must be sent to constructionbids@dnr.iowa.gov All bids, and required documentation, must contain a scanned original signature - Electronic signatures are not allowed. When emailing bid documents, the subject line of the email must state the following: Project Number, Project Name, and Bid Letting Date. Please ensure the first page of the emailed attachment, or first of multiple attachments, is the bid proposal. No bids shall be accepted via FAX. All Substitution Requests And Questions Must Be Submitted By 12:00pm The Friday Prior To The Bid Letting To Be Considered. Direct questions concerning Bidding and Contract Procedures to: Heath Delzell, Design Engineering Supervisor Completion Date: September 30, 2023

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents