Similar Projects
Section/Corridor Improvements - SC 146 - S-183 (Roper Mountain Rd) to S-654 (Bagwell Rd)
Alteration
Conception
$1,600,000 est. value
Taylors, SC

Zoo Walkway Repaving - City of Greenville
Alteration
Conception
$366,500 est. value
Greenville, SC 29601

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Design
$600,000 CJ est. value
Greer, SC 29651

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Design
$600,000 CJ est. value
Greer, SC 29651

Greenville Technical College - Parking Lot R Construction
Infrastructure
Bidding
$3,500,000 CJ est. value
Greenville, SC 29607

Greenville Technical College - Parking Lot R Construction
Infrastructure
Bidding
$3,500,000 CJ est. value
Greenville, SC 29607

PRISMA Health Swamp Rabbit Trail Signal Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Greenville, SC 29601

ACA Cleanup Underground Storage Tank (UST) Site - 11929
Infrastructure
Sub-Bidding
$800,000 CJ est. value
Greenville, SC 29607

Lot Maintenance Services
Term Contract
Post-Bid
Greenville, SC

Simpsonville Fire Department Removal and Replacement of Concrete Parking Lot
Infrastructure
Post-Bid
Simpsonville, SC 29680

Asphalt Work-Two Locations
Results
Fort Mill, SC 29715

Haywood Road Sidewalk Improvements Project
Results
Greenville, SC 29601

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Last Updated 08/11/2022 02:06 PM
Project Title

Bus Stop Construction & Installations - Phase 2

Physical Address View project details and contacts
City, State (County) Greenville, SC 29601   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Greenville is assisting the Greenville Transit Authority (GTA) in Greenville, South Carolina, in soliciting bids from qualified contractors for the installation of bus stop pads, shelters, sidewalk, and other amenities in support of Greenville's public transit service. All bus stop amenities will be provided by GTA. This Phase 2 project includes 31 different bus stops along SCDOT and locally owned roads within GTA's service area. The deadline for questions is 2:00 p.m., August 3, 2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents