Similar Projects
12th Avenue Sewer Trunk Main Oversizing - 822626 - City of Hanford
Infrastructure
Conception
$400,000 CJ est. value
Hanford, CA 93230

Water Distribution Main Extension Program - 823638 - City of Hanford
Infrastructure
Conception
$1,968,000 CJ est. value
Hanford, CA 93230

Replace Bridge
Demolition, New Construction, Infrastructure
Design
$18,500,000 CJ est. value
Stratford, CA 93266

Pavement Rehabilitation (2R)
Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CA 93266

Avenal Cutoff Roadway Improvements Phase 1
Renovation, Infrastructure
Bidding
$6,900,000 CJ est. value
Avenal, CA 93239

Replace building 175 Tie-Down points infrastructure - NAS Lemoore
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Lemoore Naval Air Station, CA 93246

SB Minor B - Cold Plane Asphalt Concrete Pavement and Place Hot Mix Asphalt
Infrastructure
Post-Bid
$350,000 CJ est. value
Avenal, CA 93204

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Burris Park and Hickey Park Site Improvements
Infrastructure
Results
$92,478 CJ est. value
Stratford, CA 93266

O'Reilly Auto Parts (AVL) #6021 / Avenal
New Construction, Infrastructure - 7,453 SF
Construction
$1,300,000 CJ est. value
Avenal, CA 93204

Central Valley Meat Plant Expansion
Addition, New Construction, Infrastructure - 390,460 SF
Pending Verification
$75,500,000 CJ est. value
Hanford, CA 93230

Jackson Avenue Beef Harvesting Plant
New Construction, Infrastructure - 65,200 SF
Pending Verification
$40,000,000 CJ est. value
Hanford, CA 93230

Pavement Resurfacing Treatment - 822615 - City of Hanford
Infrastructure
Conception
$2,550,000 CJ est. value
Hanford, CA 93230

Repair, Replace and Reline Culverts
Infrastructure
Design
$14,900,000 CJ est. value
Lemoore, CA 93245

Hanford West Sierra Pacific Sports Field Lighting
Infrastructure
Post-Bid
$600,000 CJ est. value
Hanford, CA 93230

Last Updated 08/28/2023 03:09 PM
Project Title

Well 13 Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Lemoore, CA 93245   (Kings County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $84,540 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions regarding this project during the bidding phase shall be directed to the Project Engineer, Mr. Randon Reeder or Frank Rivera at rreeder@lemoore.com. Questions are due no later than 7-days prior to bid opening Time of completion for the work shall be thirty (45) calendar days from (a) the date of commencement of the work as established in the Citys Notice to Proceed, or (b) if no other date is established in a Notice to Proceed from City, the date of Contractors actual commencement of the Work (including mobilization). A certified check, cashiers check, or bidder's bond in the amount of ten percent (10%) of the bid made payable to the City of Lemoore will be required to accompany each bid. If a bid bond is used, it must be issued by an Admitted Surety (an insurance organization authorized by the Insurance Commissioner to transact surety insurance in the State of California during this calendar year), which shall be given as a guarantee that the bidder will enter into a Contract if awarded the Work and will be declared forfeited, paid to, or retained by the City as liquidated damages if the bidder refuses or neglects to enter into the Contract provided by the City after being requested to do so. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. City reserves the right to approve or reject the surety insurer selected by Contractor and to require Contractor to obtain a bond from a surety insurer satisfactory to the City The Disadvantage Business Enterprise (DBE) Contract goal is 8%.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents