Similar Projects
Sidewalk/Drainage Improvements - Oakland Park Sidewalks
Infrastructure
Bidding
$2,296,696 est. value
FL

Johnson Street Culvert Crossing Project
Infrastructure
Bidding
Pembroke Pines, FL

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Shore Protection Project, Segment II, Beach Renourishment 2020-2021, Broward County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Interchange/Modification/Bridge Widening/Drainage Improvements/Milling and Resurfacing
Results
Less than $26,400,000 est. value
FL

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

SBDD 2020 Fabric-Formed Erosion Protection
Results
Davie, Southwest Ranches, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Drainage Maintenance
Results
Less than $475,000 est. value
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Sidewalk and Drainage Maintenance and Repair
Term Contract
Results
$525,000 est. value
Fort Lauderdale, FL 33301

Broward College Building 49 Drainage
Infrastructure
Post-Bid
FL

Last Updated 11/29/2021 10:11 AM
Project Title

Hugh Taylor Birch State Park - Culvert Replacement

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33304   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all labor, materials, equipment, supervision and permitting to construct the rehabilitation of existing 72” CMP Culvert #1 per the contract documents. Installation Floater and Longshoreman’s Insurance is required for this project and must be included in bid price.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents