Similar Projects
Pavement Reconstruction (Sustainable)
Infrastructure
Bidding
$5,250,000 CJ est. value
Alhambra, CA 91801

Residential Concrete Improvements
Infrastructure
Sub-Bidding
$540,000 CJ est. value
Santa Fe Springs, CA 90670

Concrete Repair Program - Phase XI
Infrastructure, Alteration
Post-Bid
$169,000 est. value
West Hollywood, CA 90069

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Outdoor Gym Concrete
Alteration
Results
$100,000 est. value
Lancaster, CA 93536

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Install Plants, Irrigation, and Prepare and Stain AC and Concrete
Alteration
Results
$830,000 est. value
City of Industry, CA 91714

FY 2021-2022 Concrete Repair
Alteration
Post-Bid
$190,000 est. value
Walnut, CA

Prepare and Stain Concrete
Alteration
Results
$640,000 est. value
Los Angeles, CA

Portland Cement Concrete Materials (As-Needed)
Term Contract
Post-Bid
$35,000 est. value
Palmdale, CA

Individual Slab Replacement
Alteration
Results
$2,800,000 est. value
Long Beach, CA 90810

RFQ Contractor - Belmont Beach and Aquatics Center
Demolition, New Construction, Infrastructure - 90,480 SF
Post-Bid
$70,000,000 CJ est. value
Long Beach, CA 90803

Last Updated 12/13/2022 12:13 PM
Project Title

U-Portables Removal Project

Physical Address View project details and contacts
City, State (County) Long Beach, CA 90808   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $139,500 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, and equipment to prepare the U-Portables site for the removal of the Leased Mobile Modular classroom, (5) units total, disconnect, medium and low voltage power, remove all obstacles preventing modular company from removing modular units. This project is to be completed in phases. Mobile Modular will be the responsible party to remove the modular units of the parking lot A once Phase I is completed. After modular units' removal Contractor will be responsible of restoring parking lot A, by removing all underground conduits to POC as shown on the attached sketches, backfilling holes and trenches, patching with asphalt, then coating the entire parking lot A with slurry, striping, adding new wheel stops to all stalls, and placing new ADA stalls and parking accessories. A District allowance amount of $15,000 for Unforeseen Conditions must be added to your Bid Proposal Amount. See bid form for more information. Online Q&A Yes Q&A Deadline 11/30/2022 10:00 AM (PST) s. All questions are to be submitted through PlanetBids only. Bidders are solely and exclusively responsible for submitting such inquiries or clarification Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 91 consecutive calendar days Liquidated Damages $500/day License Requirements B Type of Award Lump Sum

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents